Brussels April 16th 2007 Association of the French Consultants in Petroleum Association of 70 Individual Members & 7 Partners Members (SME) with its communication/cooperation.

Similar presentations


Presentation on theme: "Brussels April 16th 2007 Association of the French Consultants in Petroleum Association of 70 Individual Members & 7 Partners Members (SME) with its communication/cooperation."— Presentation transcript:

1 Brussels April 16th 2007 Association of the French Consultants in Petroleum Association of 70 Individual Members & 7 Partners Members (SME) with its communication/cooperation network between specialists. Aiming at assisting the NOC/IOC’s in : -The oil/gas fields development/operation covering the production, transportation (pipelines) and treatment installations - The assessment, training & coaching of the operation team.

2 Brussels April 16th 2007 Les Métiers des Experts ACP Association of the French Petroleum Consultants Geology – Geophysics – Drilling – Complétion – Production - Gisement – Reservoir - Diagraphies Pipelines – Installations – Refinery – Petrochimical Strategy – Evaluation – Management – Finances Quality – Safety – Environment - CDM Training - Maintenance

3 Brussels April 16th 2007 EXPERIENCE IN TRAINING PROJECTS Key expertise of the ACP members Engineering/Management Training Centers Engineering/Implementation Training Projects

4 Brussels April 16th 2007 EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA Turkmenbashi Refinery Training Center, Apr 98 to Sept 99 Preparation in France and Turkmenistan/ Assessment/ Training needs/ Training/ Final Assessment Training modules in Russian, theoretical (Polytechnicum University), practical (ACP experts & contractors) and simulator (RSI, ACP partner). Logistics : contractors (RSI, Polytechnicum, DCS, UOP process), equipment & tools (computers, simulators…) manuals, translation & interpretation The training 20 star operators, 60 new operators; 26 weeks training plan covering -Background recap -General chemistry (Anal lab, English, Measur & Control, Maintenance, Safety) -Applied training (Advanc English & PC, applied Physics & Chemistry, Oil & Gas products, Process simulation, Instrum & DCS, Operation & safety)

5 Brussels April 16th 2007 EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA Kashagan ENI Training Center, Jan 05 to Dec 06 Modules developed abroad (ENI Petroleum University), 18 sessions of 22 weeks (60 students/session) : Exploration, Production and Processing of hydrocarbons Reservoir Well completion Oil & Gas : definitions, process & mechanical equipment, treatment plant -KCO production facilities description -Process general description -Measurement & Control -Materials and assembling -Maintenance -Basic HSE -Field practice -Assessment

6  15 classrooms, including Multimedia/IT room and Library  3 Workshops and 1 Chemical Laboratory with chemicals storage  Process Training Area with Process and Drilling Simulators  Dynamic simulator that replicates Eskene West & ‘D’ Island processes The Atyrau Training Centre

7 Brussels April 16th 2007 EXPERIENCE ON TRAINING PROJECTS IN CENTRAL ASIA Khiva UrgenchTransGas Training Center (TACIS project), July 05 to Dec 06. Pipeline engineers/technicians :Uzbekistan, Turkmenistan, Kazakhstan, Kyrgyzstan Preparation in France and in Uzbekistan/ Assessment/ Training needs/ Training/ Final Assessment Training modules in Russian, theoretical (Gubkin Institute); practical (TECHNIPIPE/ACP experts) and “train the trainers”.

8 Brussels April 16th 2007 Technical Audit Pipelines @ PNIS

9 Brussels April 16th 2007 Technical Audit Pipelines @ PNIS Khiva Training Center Training Plan made up of 8 Modules designed after Competence/knowledge assessment Modules 1 & 2 : engineering, design, construction and maintenance of pipelines (Khiva, Almaty & Moscow) Module 3 : Inspection (using tools sourced from European suppliers)

10 Brussels April 16th 2007 Technical Audit Pipelines @ PNIS Khiva Training Center Module 4 : On site Above ground Inspections (in Bishkek area) Module 5 : On line Pigging (in Samarkand with Rosen) of 40’’ x 156 km. Modules 6 & 7 : PNIS implementation operation & maintenance (theory only) Module 8 : Train the trainers (for the Beneficiaries to be able to train in their own countries)

11 Brussels April 16th 2007 POPULATION TO BE HIRED YEARLY OPERATION/MAINTENANCE employeesnew employment Tukmengas prod population6000 Tukmennefte prod population6000 Offshore dragon oil, Petronas, Wintershall1000 On shore Mitro, ENI, CNPC1000 Galkynysh (Petrofac)2000 Total production160001200 Refineries70053 Turkmentransgas, Turkmengas, Turkmennefte6000450 Total up/downstream1703 New project production 400 New project petrochemical400 New project pipeline 500 Total up/downstream with New projects 3003 replacemenent rate7,5%

12 Brussels April 16th 2007 3000 TECHNICIAN TO BE TRAINED EVERY YEAR OPERATION/MAINTENANCE How to be efficient : adapted to local context and linked to education -limited to job requirement -enhancement of entry level How to increase productivity of investment : broad (national) approach -qualification training direction (operators and maintenance)

13 Brussels April 16th 2007 3000 TECHNICIAN TO BE TRAINED EVERY YEAR OPERATION/MAINTENANCE Thank you Association des Consultants Pétroliers 9 rue du Gué 92500 RUEIL MALMAISON www.acp-france.org


Download ppt "Brussels April 16th 2007 Association of the French Consultants in Petroleum Association of 70 Individual Members & 7 Partners Members (SME) with its communication/cooperation."