IST & VMware ESX: What we did. 2010 | The Sky’s the Limit Agenda IST Setup o POD design o Usage o Scalability & Capital Cost o Reliability VM as a Service.

Similar presentations


Presentation on theme: "IST & VMware ESX: What we did. 2010 | The Sky’s the Limit Agenda IST Setup o POD design o Usage o Scalability & Capital Cost o Reliability VM as a Service."— Presentation transcript:

1 IST & VMware ESX: What we did

2 2010 | The Sky’s the Limit Agenda IST Setup o POD design o Usage o Scalability & Capital Cost o Reliability VM as a Service

3 2010 | The Sky’s the Limit Overview VMware ESXi 4.1 Dell & Netapp

4 2010 | The Sky’s the Limit Pod Design POD = Compute Nodes + Storage

5 2010 | The Sky’s the Limit Pod Design POD = Compute Nodes + Storage PODS o Development

6 2010 | The Sky’s the Limit Pod Design POD = Compute Nodes + Storage PODS o Development o Production – MC (Primary)

7 2010 | The Sky’s the Limit Pod Design POD = Compute Nodes + Storage PODS o Development o Production – MC (Primary) o Production – PHY (Secondary)

8 2010 | The Sky’s the Limit Compute Detail - Server Embedded boot device LOTS of RAM!

9 2010 | The Sky’s the Limit Compute Detail - Network Five 1Gig interfaces o 2 interfaces for management o 2 interfaces for VM traffic o 1 OOB KVM host management 10Gig

10 2010 | The Sky’s the Limit Compute Detail - Storage NFS Dedupe = 50% (2:1)

11 2010 | The Sky’s the Limit POD Services vMotion SvMotion VMware DRS VMware HA & FT

12 2010 | The Sky’s the Limit VM Count Dev = 100 + 12 templates Prod-MC = 40 Prod-PHY = 15 Total = 155 35% Linux, 65% Windows

13 2010 | The Sky’s the Limit Dev POD cost - 3 years Dev Servers = 3 * $30K Dev Storage = $60K Total cost = $150K VMs = 100 Simple amortized cost = $500/vm/year

14 2010 | The Sky’s the Limit Further Cost Projections Typical VM uses 2.4GB RAM Thus a total of ~200 VM Total cost drops to $250/vm/year

15 2010 | The Sky’s the Limit Reliability 95% < X < 100% No data loss Selected service outages Mitigation

16 2010 | The Sky’s the Limit Challenges VMware license renewal USB devices Reactive not proactive capacity

17 2010 | The Sky’s the Limit VM as a service Why What When

18 2010 | The Sky’s the Limit Why – Why not Cost Deployment time Management

19 2010 | The Sky’s the Limit What 1-2 vCPU (1.8Ghz) CPU 1-2 GB/RAM 20-40GB storage $600/year

20 2010 | The Sky’s the Limit What Part 2 Console access – you can install VM Firewall Load Balancer AC/Power/Monitoring/Security/etc

21 2010 | The Sky’s the Limit “SLA” Best effort

22 2010 | The Sky’s the Limit When Now – CEL & IQC already

23 Questions? 2010 | The Sky’s the Limit