1 Free Template from www.brainybetty.com 1. 2 2  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee.

Similar presentations


Presentation on theme: "1 Free Template from www.brainybetty.com 1. 2 2  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee."— Presentation transcript:

1 1 Free Template from www.brainybetty.com 1

2 2 2  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee  Other  NERC  FERC  Order 676-H  ATC Workshop

3 3 Free Template from www.brainybetty.com 3  e-Tag 1.8.2  Electric Industry Registry Update  WEQ-004 Coordinate Interchange Business Practice Standards  Meetings

4 4 Free Template from www.brainybetty.com 4  Interoperability testing completed 2014  Implementation/cut-over is midnight CST between March 30 th and 31 st 2015  1.8.1.1 Retirement Date: May 1, 2015  You have the month of April to replace any 1.8.1.1 e-Tags  Materials are posted on the NAESB web site (but you have to login first)  https://www.naesb.org//weq/weq_jess_etag_1.8.1.asp https://www.naesb.org//weq/weq_jess_etag_1.8.1.asp

5 5 Free Template from www.brainybetty.com 5  Ramp Duration logic regarding e-Tag duration – New logic compares the time ordered segment duration(s) to verify that the ramps do not overlap between segments. The duration of each time ordered segment must be greater than or equal to the sum of one-half its ramp start duration plus one-half its ramp stop duration.  To help facilitate Network Integration Transmission Service (NITS) on OASIS, a NITS resource may be included on a tag by utilizing the NITSResource data elements in the transmission allocation. A Transmission Service Provider may require additional information to evaluate a NITS request. This additional information is not documented in the e-Tag Specification, but should be available in the Transmission Service Provider’s posted business practices.

6 6 Free Template from www.brainybetty.com 6  Section 4.6.1.2 discusses the ability of a Market Operator (MO) on the Physical Path to adjust the Market Level Profile. This will allow intermediate MOs to submit e-Tag market level profile adjustments based on market needs.  When a tag correction is submitted, the tag will require certain Approval Entities (based upon what was corrected) to reassess the tag. If the correction crosses a time limit and changes the Time Classification of the request, such as from “ON-TIME” to “LATE”, then the tag must be reassessed by all Approval Entities.

7 7 Free Template from www.brainybetty.com 7  Logic was added to verify that only one TSP may be associated with a transmission physical segment, and to allow multiple PSEs to be associated with the same transmission physical segment, this is also referred to as stacking.  Logic and verification was added to ensure that the current profile of e-Tags is being computed using the lowest reliability limit based on comparison across participants, i.e. per participant reliability profiles are being considered. The e-Tag system will use the most restrictive profile limit.

8 8 Free Template from www.brainybetty.com 8  Appendix A, Special Interconnection Implementations Requirements, provides a detailed description of special types of tags.  e-Tagging Requirements For Western Interconnection Capacity Tags:  Allows the capacity tag adjustment to be made by the Sink BA and LSE. Adjustments to the approved tag’s market level profiles will only require approval from the Source BA and Sink BA.  e-Tagging Requirements For Western Interconnection Ten Minute Recallable Tags:  Allows the ten minute recallable tag adjustment to be made by the Source BA and GPE. Adjustments to the approved tag’s market level profiles will only require approval from the Source BA and Sink BA.

9 9 ER14001 – TVA requested new energy product code 7-CB (for tagging CBM). Implemented. ER13002 – NWMT requested mechanism to notify when objects will be removed from EIR publication. Implemented. ER13001 – NERC requested EIR include schema and GUI for registration and approval of pseudo-ties. In testing. Implementation expected 2Q2015.

10 10 Free Template from www.brainybetty.com 10  Modified and approved by WEQ EC in August 2014 and ratified by the membership.

11

12 J.T. Wood and Alan Pritchard, co-chairs (Paul Sorenson resigned chair position) The subcommittee’s development activity on Preemption and Competition was placed on hold due Order 676-H. In that order, NAESB was asked to make revisions to Version 003 Business Practice Standards to reflect the “Entergy/Dynegy” rulings and other modifications.

13 “Entergy/Dynegy” rulings addressed treatment redirects on a firm basis. Redirected capacity on the parent path is not released until the redirect becomes unconditional. If a conditional redirect be impacted by a competition, the customer can return to the parent path/ reservation. A redirect on a firm basis which is end of term shall inherit the parent’s reservation priority. Dynegy – EL01-104 Entergy – ER05-1065, OA07-32, ER12-1071 676-H – RM05-5

14 On March 17, 2015 NAESB posted for formal comment four recommendations from the OASIS subcommittee related to Order 676-H. The recommendation addressing the Entergy/ Dynegy orders only focusses on when the parent reservation is unconditional. The subcommittee could not reach consensus on how to handle a scenario where the parent reservation is still conditional at the time the firm redirect is confirmed. Providers will have to post in their business practices how they will handle this scenario. These recommendations will be considered at the next WEQ EC meeting.

15

16  Spent the last five years working on Parallel Flow Visualization (PFV). Subcommittee voted out for formal comment the end of September 2014.  At the end of October 2014, the WEQ EC was to vote on the PFV business practice standards. But pre-meeting communications indicated one or two segments may block approval.  So, WEQ EC formed a PFV Task Force to hammer out existing issues in an effort to preserve the work of the subcommittee.  The revised PFV recommendation was passed at the Feb 24, 2015 WEQ EC meeting.

17 17 Free Template from www.brainybetty.com 17  In early 2014, NERC “MOD A” Standards Drafting Team submitted NAESB Standards request R14002 for the potential development of ACE standards.  A WEQ EC Task Force took 200+ requirements/sub-requirements abandoned by the NERC MOD A drafting team and developed a recommendation of “1 must have” and “41 please consider” requirements.

18 18 Free Template from www.brainybetty.com 18  In Oct 2014, the Business Practice Subcommittee began crafting ATC/AFC business practice standards and has had one round of informal comments  Keeping the three methodologies  A recent topic of discussion centers around bounding commercial activity not only by reliability limits, but also by the “physical rights/investment” to “move” energy.  Desired completion by the end of 2Q2015

19

20  Next WEQ Executive Committee meeting April 28, 2015 in Carmel, IN  In December 2014 the Board approved changes to NAESB’s structure  Retail Market Quadrant (formally Retail Gas and Retail Electric Quadrants officially combined)

21  All new standards became effective October 1, 2014, except INT-004-3, Requirement 3.  “Requirement R3 will become effective on the first calendar day two calendar quarters after the NAESB Electric Industry Registry is able to accept Pseudo-Tie registrations. All existing and future Pseudo-Ties are to be registered in the NAESB Electric Industry Registry.”

22

23  Workshop on Available Transfer Capability Standards for Wholesale Electric Transmission Services (AD15-5-000)  FERC staff will convene a workshop to discuss actions the Commission could take to ensure that transmission providers continue to calculate and post available transfer capability (ATC) in a manner that ensures nondiscriminatory access to wholesale electric transmission services.  Suppose to be Thursday, March 05, 2015, but was postponed due to weather. It has been rescheduled April 21, 2015 at FERC offices in Washington, DC.

24 24


Download ppt "1 Free Template from www.brainybetty.com 1. 2 2  NAESB  Coordinate Interchange Scheduling Subcommittee  OASIS Subcommittee  Business Practice Subcommittee."