TPC-Meeting : Københaven 2.9.02 Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->

Similar presentations


Presentation on theme: "TPC-Meeting : Københaven 2.9.02 Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->"— Presentation transcript:

1 TPC-Meeting : Københaven 2.9.02 Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling --> Gas

2 Ne-CO 2 - Gas System : Mixing Unitok Compressor Rackok Cleaning Cartridgesok Pressure Tankok CO 2 - Removerprep Hardware ready --> Jan 2003 Slow control --> mid 2003

3

4 Ne-CO 2 - Gas Quality Controls CO 2 - Monitor (0.1%)--> permanent 2(O 2 & H 2 O) -Monitor’s--> permanent 2 Goofie - Drift-Monitors --> permanent –Drift vel : < 1 %o –Gas (in & out; mounting: near TPC-vessel) Gas Chromatograph--> if needed –N2; impurities(CH n ; SF 6 ; ect.);

5 CO 2 - Insulation Gap Gas System CO 2 - Recovery : –Closed System –Design Meeting --> Alice week: sept.02

6 TPC_Resistor Rod Promised : –Weight Watching & Contacts : *1/4 & 100 cm Model –Cooling Tests : 100 cm Model –HV & Security Tests : 200 cm Model

7 Contacts

8 WaterflowWaterflow

9 Cooling Efficiency :--> T.M --> BTC !

10 Rod - Cooling Systems Leakless Water Cooling –Control System : like FEC’s –10 mm Pipes –Cost : 25 kSFR CO 2 - Gas Cooling –60 mm Pipes & 50 m –Leaks into Ne_CO 2 Volume ??? –Cost : (30 components + 30 labor (?) + – 20 heat exchanger ) --> 80 kSFR (?)

11

12

13 Rod-HV- Tests 300 kV HI-Injector @ GSI 30 Years of HV-Operation With : Distilled Water-Resistor Chain

14

15

16

17

18 300 kV GSI Ion Source : Uses since 30 years : Destilled Water Channel as 300kV Divider –Interlock : Water Quality < 2 µ Siemens / cm Resistor Rod HV test : –Rod-Cooling Water Channel --> –Connected to HV with Copper-Return Bridge Additonal parallel resistor : --> f(water quality) Are’s test setup:

19

20

21

22

23

24

25

26

27 HV-Test @ GSI HI - source Rod in Nitrogen Atmosphere Rod filled with : –Nitrogen –Distilled Water ( < 0.1 & <1 µ Siemens) –Circulation Pump OFF –Tap - Water ∂V_last Resistor & Total Rod Current

28

29

30

31

32

33 Conclusions : I Removable Resistor Rod : –Possible --> go_to --> 250 cm AGC --> –very efficient -> results soon –Price & Space Liquid Cooled Rod : internally save : –HV & Leak –Ceramic Bridge --> Security Factor: * 10 15 –Rod Resistivity = f (water quality) --> adjust !

34 Conclusions : II Remaining Heat Sources in TPC –G_Ohm Resistor Chain -> up to 4 Watt Let’s Cool them !!!

35 4W - Distilled Water Resistor Chain Adjust Water Quality : --> (0.05 and 2) µ_Siemens ( 18 --> 0.5 ) M_Ohm / cm TPC Gas Heat Problem gone !TPC Gas Heat Problem gone !


Download ppt "TPC-Meeting : Københaven 2.9.02 Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->"