Download presentation
Presentation is loading. Please wait.
Published byJoy Hart Modified over 9 years ago
1
GEM Group SETUP Project The Science Education Teaching Unit Preparation Project S E T U P Prepared for the National Science Foundation NSF 01-136: Science, Technology, Engineering, and Mathematics Teacher Preparation (STEMTP) Prepared by Dr. Chris Hasegawa California State University, Monterey Bay CST 308 Fall 2001 Professor Carolyn Sabin Team Members Gillian Keisker, Enrico Monteleone and Maria Valladares
2
GEM Group SETUP Project Executive Summary
3
GEM Group SETUP Project Introduction
4
GEM Group SETUP Project Objectives
5
GEM Group SETUP Project Needs Analysis: Teachers The Salinas High School District needs standards- based teaching –One in five teachers in the Salinas Valley and neighboring communities does not have a proper teaching credential –Eighty of the district's 540 teachers are in the first or second year of service. –The majority who are teaching Math, and Science, are teaching with a substandard credential.
6
GEM Group SETUP Project Needs Analysis: Students The Salinas High School District is ethnically diverse Majority population is Latino (Mexican-American labor)
7
GEM Group SETUP Project Needs Analysis: Students
8
GEM Group SETUP Project Needs Analysis: MPUSD teachers Every year about 5% are new to the profession From those 11% lack full credentials By their fifth year 20% have left the district Different ethnic background –26% non white teachers –40% of the students are minority Little or no training in teaching to state/national standards
9
GEM Group SETUP Project Needs Analysis: MPUSD students Monterey Peninsula Unified School District –MPUSD students outscores Salinas High School District, but results are also dismal –20.3% of its graduates are UC/CSU eligible –35.6% statewide are UC/CSU eligible –This disparity affects all racial/ethnic groups –Low income families
10
GEM Group SETUP Project Needs Analysis: Conclusion Under-prepared teachers Low income Background differences Factors to the poor academic performance
11
GEM Group SETUP Project Content Description: The Site Lesson Plan –Objectives –Background –Procedures –Resources –Troubleshooting Troubleshoot Forum
12
GEM Group SETUP Project Budget
13
GEM Group SETUP Project Detailed Design Document
14
GEM Group SETUP Project Scope of Work
15
GEM Group SETUP Project Work Plan Tasks Timeline Resources
16
GEM Group SETUP Project Questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.