BIM Project Execution Planning
Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University Thursday, January 11, 2012
2
BIM Project Execution Planning Procedure
3
“Begin with the end in mind.”
Identifying BIM Goals and Uses “Begin with the end in mind.”
4
BIM Goals
5
Identifying BIM Goals and Uses
6
Identifying BIM Goals and Uses
7
Frequency and Benefit of Uses
8
Capabilities & Resources
BIM Use Selection Worksheet BIM Use Responsible Party Proceed? Capabilities & Resources Value
9
Design BIM Project Execution Process
10
Level Two Process Maps
11
Develop Information Exchanges
12
Information Exchange Worksheet
= Output Inadequacy (Revise Information) OR = Input Inadequacy (Revise Responsible Party)
13
Supporting Infrastructure
14
Plan Template
15
Lessons Learned Need BIM Champion(s) Owner Involvement is Critical Need team Buy-in and Transparency The Planning Procedure should allow for Adaptations by the Project Team The Project Execution Plan must be considered a Living Document Planning takes Resources and it is Critical that Resources are Available
16
Acknowledgements Sponsors: Advisory Board Members PSU Research Team
The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners: LACCD Whiting Turner Barton Malow USACE Clark Construction Group GSA Balfour Beatty Jacobs MA DCAM Advisory Board Members Dana ‘Deke’ Smith Ed Gannon Steve Hutsell Kurt Maldovan Mark Butler Greg Gidez Mark Konchar Victor Sanvido Derek Cunz Francois Grobler Soad Kousheshi Alexander Zolotov Mark Falzarano Steve Hagan Rob Leicht PSU Research Team Students: Craig Dubler Ralph Kreider Chitwan Saluja Shane Goodman Eric Nulton Nevena Zikic Colleen Kasprzak Faculty: Chimay Anumba Sam Hunter John Messner
17
BIM Project Execution Planning
? BIM Project Execution Planning Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University Download the Guide at: bim.psu.edu
18
What to do for this class
Create a PxP Template Add sections on decision making Map BIM Process Level 1 and Level 2 Map Design Process Level 1 – Project Team Level 2 – Individual Process Information Exchanges What information is required Keep it up to Date