Download presentation
Presentation is loading. Please wait.
Published byAlvin Malone Modified over 9 years ago
1
Measuring the Value: Valuing the Measure Caslin 12 th – 15 th June 2006 Deborah Novotny Head of Preservation
2
2 2 Overview - Times they are a-changin’ Two examples: Contingent Valuation condition survey
3
3 3 Modernisation programme 2000 modernisation programme new CEO reorganisation management structure rigorous strategic agenda re-engineered information supply service obtain electronic legal deposit Optimise efficiency savings programme of reform service improvement
4
4 4 Graph of funding
5
5 5 Measuring Our Value independent economic impact study Kenneth Arrow & Robert Solow quantitative evaluation economic cultural social intellectual directly indirectly
6
6 6 Contingent Valuation 2000 people interviewed random selection from different groups snapshot does not capture emerging products and services e.g. digitisation and web-based services
7
7 7 Contingent Valuation Methodology: Questionnaire 1. willingness to pay 2. willingness to accept 3. investment in accessing the services 4. the cost of alternative 5. change in demand to a hypothetical price change
8
8 8 Results of the study The total value each year of the British Library is £363m of which £304m is indirect value and £59m direct value. For every £1 of public funding the British Library receives annually, £4.40 is generated for the UK economy. If the British Library did not exist, the UK would lose £280m of economic value per annum. £363m £83m Benefit cost ratio 4.4:1 Total Value per annum Public Funding
9
9 9 background to the surveys programme headline results using the findings need for an objective picture of the state of the collections need for a standardised tool to achieve this BL Preservation Needs Assessment Surveys
10
10 Pas weighted scoring Sample of c.400 items assessed (+/- 5% accuracy) Low score = low preservation need/low priority High score = high preservation need/high priority
11
11 PAS Scoring Very Low Priority (1-20) Medium Priority (41-60) High Priority (61-80) Low Priority (21-40) Very High Priority (81-100) BAND 1BAND 2BAND 3BAND 4BAND 5
12
12 KNOWING THE NEED - National UK Picture 97 surveys completed so far 43,000 individual items surveyed (represents estimated 28 million collection items) 87% of UK collections are in stable condition 13% of UK collections are in unstable condition 70% of material surveyed show some form of damage 21% of material surveyed showed evidence of brittle paper 80% of all newspapers surveyed showed some form of damage Most pressing issues are environment, written disaster plan, Storage, ‘housekeeping’ – cleaning.
13
13 BL results: condition (as % stable/unstable)
14
14 Condition survey - assessment
15
15 Results: NEWSPAPER LIBRARY Condition and Preservation Priority Bands % Stable: 65.92 % Unstable: 34.08 % in Band 1: 1 % in Band 2: 41.79 % in Band 3: 38.31 % in Band 4: 18.15 % in Band 5: 0.75
16
16 Results: MAPS Condition and Preservation Priority Bands % Stable: 92.35 % Unstable: 7.65 % in Band 1: 33.58 % in Band 2: 57.28 % in Band 3: 8.64 % in Band 4: 0.5 % in Band 5: 0
17
17 establish a baseline figure of condition (KPI) make informed preservation funding decisions contribute to the national picture of preservation needs answer ad hoc preservation questions gain valuable incidental information learn from the experience for future surveys Using the results
18
18 Condition of the collections: Key Performance Indicator delivered March 2004 86% of the British Library’s collections in stable condition Using the results: baseline statistic
19
19 Preservation bidding cycle £3m preservation budget collection areas bid for work via bidding database same format, same criteria applied to all bids bids for conservation boxing/enclosure binding microfilming digitisation migration furbishing condition assessment OctNov Dec-Jan Bidding cycle begins All bids submitted by end of month All bids verified, scores computed bids for external services costed, budget profiled bids for internal treatments sent to Conservation for estimating Feb Preservation Board meets to ratify budget and bid programmes April Programmes begin
20
20 Preservation Bidding Scoring Matrix
21
21 Using results: comparing strategies – an example of “What if” projections
22
22 The end Happy to be here Happy to answer questions Thank you
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.