Download presentation
Presentation is loading. Please wait.
Published byDwayne Hudson Modified over 9 years ago
1
Quiz 1 Review and Instructions
2
Review Create a new project file and enter a project date Enter properties about the project file Save the project file
3
Review (cont) Enter task information Enter task durations Link tasks/predecessors Add & delete tasks
4
Review (cont) Set up calendars Create a milestone Creating WBS
5
Quiz 1 Two different files will be returned to me before session 9 One as the original Another with the modifications (i.e., deleting of tasks, various linking, etc)
6
Quiz 1 Instructions 1.Use the data from the word file entitled “Quiz 1 data” to build a schedule in MS Project. 2.You will be submitting two (2) files. The first file will be the original schedule. The second file will demonstrate you know how to delete a task and make the logical connections different. 3.Name the files with your last name-quiz1-file1; last name-quiz1-file2 4.Make sure to save your work frequently. You can ask questions.
7
Grading for Quiz 1 Enter the task names, durations, and logical connections – 60 points Add a WBS column, enter the WBS structure, and levels – 20 points Create the milestones correctly – 15 points Deleting a task and changing the logical connections – 15 points
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.