GREEN ENERGY THAT WORKS. Greeley Colorado June 30, 2009 Dan Perry – Wyoming/Colorado Equipment AGENDA About Endurance Endurance Products Wind Working.

Similar presentations


Presentation on theme: "GREEN ENERGY THAT WORKS. Greeley Colorado June 30, 2009 Dan Perry – Wyoming/Colorado Equipment AGENDA About Endurance Endurance Products Wind Working."— Presentation transcript:

1 GREEN ENERGY THAT WORKS

2 Greeley Colorado June 30, 2009 Dan Perry – Wyoming/Colorado Equipment AGENDA About Endurance Endurance Products Wind Working For You

3 About Endurance Surrey BC – Manufacturing R&D - Spanish Fork Utah Sales and Distribution – BTI Wind Energy – Greensburg KS Colorado Equipment - CO Points of Interest!

4 Company Background Dean Davis and David Laino – Founding Engineers (Won DOE Grant to design and build this machine original Turbine) Formation of Company - Endurance Wind Power (Partnered with Financial and Marketing Executives to become Endurance) Commercialize S250 5 kw Turbine (Turbine designed to offset needs of home owner: Designed to large wind specs for safety/production) BTI Wind Energy – Greensburg (Partnered with BTI Wind Energy to form tight Network of Sales/Service distributors from John Deere dealers) Acquire Energy PGE – 35 and 50 kw Turbine (Bought larger turbine manufacturer to fill the needs of our customer base…Schools, Municipalities, Farmers, Ranchers, Small Commercial, Small Industrial) 100 + S250 Installations G and E Series – 14 World Wide

5 Our vision: World leader in distributed wind turbines. Our mission: Develop, manufacture and market, through a network of effective and reputable dealers, a product line of reliable, high performance wind turbines, specifically engineered to meet our customers’ needs. Company Vision and Mission

6 Why Wind Power? Save money on electricity Hedge against ever increasing electricity prices Independence from the grid Impact on the environment 1.5 lbs CO2 emission p/kwh of power – US average Make a Statement

7 Why Endurance? Engineering Aesthetics Safety Efficiency High Production in Low Wind Quiet Excellent support network – BTI

8 Product Line-up - S-343 5 kw model - E-3120 50 kw 3-phase* - G-3120 50 kw single phase* *Power output can be reduced for states where net-metering regulation is limited to 40 kW - Main application: Grid-tied

9

10 S-343 5kw Power and Output

11 G and E Series Description and Features Main principles that governed the design The highest energy production in its category. Swept area of 3120 ft² (290 m²). The blade aerodynamic profile is optimized for low wind sites. Quiet sound and aesthetically sound 20-year lifetime design (meets applicable IEC standards). Ease of installation to reduce costs. Designed for grid-tied connection (Three and single phase).

12 Description and Features

13 E3120 Power and Output

14 Wind – Working for You Site Assessment and Feasibility Power profile Match production to consumption! Wind resource evaluation Firstlook, Windpro and others Turbine selection Match carefully..Do Not Try to Overproduce Site assessment Data, Pictures, Measurments,Complete Interconnection Provide complete and accurate technical data Incentives Dsireusa.org, DOE – State Energy Office ROI Must make sense for customer!

15 Wind – Working for You The “Paperwork” Interconnection Request from your utility company, complete in full! Net Metering Complete and return net metering agreement to utility! Incentives Complete loan or grant paperwork or hire someone who has experience. Must be VERY Thorough! Permits Apply through municipality and follow steps.

16 Wind – Working for You Installation and Commissioning Foundation Electrical Commissioning Start producing power Tell your friends!

17 Endurance World Tour PGE 20/35 Cornwall, England

18 St-Jean-Port-Joli, Canada Endurance World Tour Makemo, French Polynesia 6 wind turbines PGE 20/32

19 Endurance World Tour PGE 20/50 PGE test site, Saint-Jean-Port-Joli Quebec, Canada

20 Thank You!