Download presentation
Presentation is loading. Please wait.
Published byDamon Bishop Modified over 9 years ago
1
1
2
◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma: Estimated total project cost is $4.09M. Estimated first year energy savings $274K. Estimated lifetime energy savings $12.14M. $11.6M net savings to District. Environmental benefits annually: Eliminate 22.4M kg of nitrous oxides (NOx) Eliminate 12.6M kg of sulfurous oxides (SOx) Eliminate 0.84M kg of other particulates Eliminate 1.4 tons of carbon dioxide (CO2) Also bank Renewable Energy Credits (REC’s) with an estimated value of $165K. 2
3
3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.