Presentation is loading. Please wait.

Presentation is loading. Please wait.

The PSC in cooperation with CBC and KSC To adress technical standard-setting issues 2015 2016 Proposal elaborated by the PSC – discussion in GB 2015 Consultation.

Similar presentations


Presentation on theme: "The PSC in cooperation with CBC and KSC To adress technical standard-setting issues 2015 2016 Proposal elaborated by the PSC – discussion in GB 2015 Consultation."— Presentation transcript:

1 The PSC in cooperation with CBC and KSC To adress technical standard-setting issues 2015 2016 Proposal elaborated by the PSC – discussion in GB 2015 Consultation with all relevant parties Further research by the PSC Feasibility depends on external stakeholders Common forum for the ISSAI framework – group of experts 2 Separat advisory group – users of audit reports 3 Strenghtening the Due Process for professional standards 4 Permanent committee for professional matters 1 Steps to establish common supporting functions 5 Defining the long-term perspectives 6 FAC – INTOSAI financial rules, budget and statutes TFSP – overall strategic planning Reflected in the next 6-years strategic plan? Proposals for decision?

2 PSC SteerCom GB 2015 GB 2016 INCOSAI First draft Second draft Final draft Due process

3 PSC SteerCom GB 2015 GB 2016 INCOSAI First draft Second draft Final draft Due process CBC KSCFAC

4 PSC SteerCom Com. forum for FPS GB 2015 GB 2016 INCOSAI ISSAI Framework (2007 doc.) First draft Second draft Final draft Due process Progress report on clarification of Framework of Professional Standards CBC KSCFAC

5 PSC SteerCom Com. forum for FPS GB 2015 GB 2016 INCOSAI Framework of PS (2007 doc.) First draft Second draft Final draft First draft Due process Terms of reference CFFPS Progress report on clarification of Framework of Professional Standards CBC KSCFAC Advisory group?

6 1.External observers in the PSC Steering Committee are separated out as an advisory board 2. United responsibility: The Steering Comittee is developed towards a common INTOSAI forum that provides high-level leadership and ensures coordination between standards development, promotion and implementation 3. A common body is established to provide a forum for discussion and coordination of technical matters across the full ISSAI Framework. The body should prepare or take decisions which the due process for standards from 2010 gave to the PSC Chair or to the Steering Committees of either the PSC, the CBC or the KSC 4. The five subcommittees of the PSC will maintain their role in development of standards and will define the extent to which they can contribute to other goals 5. A common solution for administrative and secretarial support that can be drawn upon by all bodies

7 -Clearer Framework of Professional Standards -‘Single gateway’ for documents into the Framework

8 -Clearer Framework of Professional Standards -‘Single gateway’ for documents into the Framework -A simple process - accommodating everyone


Download ppt "The PSC in cooperation with CBC and KSC To adress technical standard-setting issues 2015 2016 Proposal elaborated by the PSC – discussion in GB 2015 Consultation."

Similar presentations


Ads by Google