Presentation is loading. Please wait.

Presentation is loading. Please wait.

CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.

Similar presentations


Presentation on theme: "CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011."— Presentation transcript:

1 CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011

2 2 © 2011 Electric Power Research Institute, Inc. All rights reserved. Agenda 1.Progress since last meeting 2.Issues, opportunities and risks arising during the previous week 3.Verify progress against stakeholder expectations 4.General issues discussion 5.Action items for individuals 6.Expected work output during next week

3 3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Progress Since Last Call Working on the wording for the dry run test participation Mark Ortiz furnished VPN client for Consumers server –Windows 64 bit version available EPRI FTP site –Windows 32 bit version also needed Mark Ortiz walked through the creation of the CIM Message and EndDeviceControl payload XSD

4 4 © 2011 Electric Power Research Institute, Inc. All rights reserved. CIM Common Message Structure

5 5 © 2011 Electric Power Research Institute, Inc. All rights reserved. UML for EndDeviceControls Messages

6 6 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample EndDeviceEventsMessage XSD <xs:schema xmlns="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns:msg="http://www.iec.ch/TC57/2010/schema/message" xmlns:obj="http://iec.ch/TC57/2010/EndDeviceEvents#" targetNamespace="http://www.iec.ch/TC57/2010/EndDeviceEventsMessage" elementFormDefault="qualified" attributeFormDefault="unqualified" version="1.0.0"> For compressed and/or binary, uuencoded payloads Hint as to format of payload, e.g. XML, RDF, SVF, BINARY, PDF,... >

7 7 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample EndDeviceEventMessage XSD (cont)

8 8 © 2011 Electric Power Research Institute, Inc. All rights reserved. Open Action Items AssigneeActionStatus John SimminsWork with internal resources to separate lab network completely from the EPRI operational network. In process Mark OrtizProvide written procedures on access to Consumer’s DMZ network and server In process Kay StefferudContract Mark Ortiz to request written procedures to access the Consumers server. In process Margaret GoodrichReview sample abstract test case.In process Mark OrtizSend Kay excel spreadsheet with test set-up information. In process

9 9 © 2011 Electric Power Research Institute, Inc. All rights reserved. Expected Work Output During the Next Week Meeting with Consumers (Mark) and EnerNex (Kay) –Consumer server login process Continue Sample Messages –General Message available –Sample of payload needed Process to connect multiple test sites needs to be dry run

10 10 © 2011 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity


Download ppt "CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011."

Similar presentations


Ads by Google