Download presentation
Presentation is loading. Please wait.
Published byAmelia Stafford Modified over 9 years ago
1
Looking east to Park Street Old tennis court area, looking south
2
Southeast corner – site prep for pond overflow pipe
3
Southeast corner – remove old overflow
4
Southeast corner – site prep for new pond overflow pipe Old overflow removed and staged to be hauled away
5
Southeast corner – site prep for new pond overflow pipe
6
Southeast corner – site prep for pond overflow pipe Site prep for new entrance to the park
7
Demo of old basketball court – a new basketball court will be relocated in the park
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.