Download presentation
Presentation is loading. Please wait.
Published byGrant Lang Modified over 9 years ago
1
The FP7 Space Programme Hugo Zunker Space Research and Development Unit
2
7th FRAMEWORK PROGRAMME
3
FP7 Budget Overview Total budget of 50,521billions Euro in the time frame 2007-2013
4
SP Cooperation 32.413 M€ Health (6,050) Food, Agriculture &Biotechnology (1,935) Information & Communication Technologies (9,110) Nanosciences, Nanotechnologies, Materials & new Production Technologies (3,500) Energy (2,300) Environment (including Climate Change) (1,900) Transport (including Aeronautics) (4,180) Socio-economic Sciences & Humanities (0,610) Space (1.430) Security (1,350) FP7 2007 – 2013
5
Call Specific Information The latest work programme, informing in detail on the main topics and the goals, as well on specific conditions related to the calls; The guidelines for applicants describing the proper structure of the proposal and explaining how the requirements of the work programme and the call should be implemented. http://cordis.europa.eu/fp7
6
FP7 « SPACE »
7
FP7-Space Space-based applications at the service of the European Society (principally Kopernikus ) Space-based applications at the service of the European Society (principally Kopernikus ) R&D strengthening Space foundations R&D strengthening Space foundations Cross-cutting issues FP7
8
GMES has been renamed …
9
Background: FP6 and ESA projects EC ESA
10
Looking ahead – based on what exists Kopernikus becomes operational Move from R&D projects to future services The user takes the centre stage Implementing the political guidelines of the GMES Bureau
11
FP7 Living in a time of transition: FP6
12
ec.europa.eu/enterprise/space_research Texte Texte Texte Texte Texte
13
The 2 nd Space call Publication: 3 September 2008 Submission deadline: 4 December 2008 Publication on our website ec.europa.eu/enterprise/space_research and Cordis website cordis.europa.eu/fp7/home_en.html
14
FP7-Space Space-based applications at the service of the European Society (principally Kopernikus ) Space-based applications at the service of the European Society (principally Kopernikus ) R&D strengthening Space foundations R&D strengthening Space foundations Cross-cutting issues FP7
15
Space Applications (focus: Kopernikus) Development of multipurpose core services Fast track + Pilot services (1 st Space call) Pilot services in new application fields (future calls) Development of downstream services (2 nd Space call) Coordinated data provision (from space, in- situ)
16
Strengthening Space Foundations New FP7 activity: ensure complementarity With extensive activities already undertaken by ESA/member states Enabling wider participation of different actors Focus on upstream research: Innovative launch/propulsion technologies Optimal preparation of scientific payloads And downstream research: Effective mission data exploitation (space science) Technology transfer R&D towards sustainable provision of critical components
17
FP7 Space: % distribution at a glance Space-based applications at the service of European society (Kopernikus) (85% of budget, i.e. 1.2 billion) 30% About 30% for services development (EC) 10% About 10% for data procurement (space based and in-situ) (ESA + EEA) 45% About 45% foreseen for developing space infrastructures (ESA) 15%Strengthening Space Foundations (15% of budget, i.e. 0.2 billion) Upstream + downstream research
18
When and how will FP7 Space funding be made available? ~ 670M€ 710 M€ 48 M€ Space Infrastructure Services, SSF R&D Space data
19
The Second FP7 Space Call 2008-2009 EUR 50 million for downstream services (Kopernikus) SSF Cross-cutting
20
FP7-Space Space-based applications at the service of the European Society (principally Kopernikus ) Space-based applications at the service of the European Society (principally Kopernikus ) R&D strengthening Space foundations R&D strengthening Space foundations Cross-cutting issues SPA.2009.1 (3 topics) 33.5MEur
21
Space-based applications at the service of European society (Kopernikus) Development of downstream services Focus on service functionality Build the ‘Kopernikus economy’ – service to a client Consolidation of monitored climate change issues Consolidate essential climate variables (ECV) Integrating usage of Earth Observation with SatCom and SatNav particularly for prevention and management of emergencies
22
Topic SPA.2009.1.1.01 – Stimulating the development of downstream Kopernikus services … to develop next generation service lines … … between the multi-purpose core services and the user client … … tailored for specific user needs … … to be financially self-supportive at the end of the project … Collaborative Projects EC contribution of EUR 1 to 3 million with upper eligibility limit of EUR 5 million ( also small Coordination and Support Actions )
23
Space Infrastructure In Situ Infrastructure OBSERVATION INFRASTRUCTURE CORE SERVICES DOWNSTREAM SERVICES How do downstream services fit into the overall Kopernikus architecture? Added Value Chain Users Security Emergency Atmosphere Marine Land d.s. characterised by European consolidation/integration characterised by tailored service to a client
24
Build on the existing Kopernikus capacities Core Services – FP6, FTS, Pilots … Secondary usage of Space Data delivered to FTS and Pilots NOTE: consult DG Enterprise website of Space Research & Development for updates of capacities
25
Space Infrastructure In Situ Infrastructure OBSERVATION INFRASTRUCTURE CORE SERVICES DOWNSTREAM SERVICES How can downstream services draw benefit from existing Kopernikus actions? Added Value Chain Users Security Emergency Atmosphere Marine Land EEA coordination action FTS 2 nd Call for proposals ESA Data Access Grant secondary usage
26
Topic SPA.2009.1.1.02 – Monitoring of climate change issues (extending core service activities) … services already provide valuable product portfolios… … enabling incorporation of the monitored essential climate variables… … generation of time series of observation datasets and re-analyses of past observational data … … enabling adequate descriptions of the status and evolution of the Earth system components … Collaborative Projects EC contribution of EUR 1 to 3 million with upper eligibility limit of EUR 5 million (also small Coordination and Support Actions )
27
Topic SPA.2009.1.1.03 – Integration of SatCom / SatNav with Earth Observation … service platform, with the objective of validating the technological concepts … … validation of specific test-beds, based on real situations … … specific user-driven development of services … … impact the quick and inexpensive access to real- time EO data … Collaborative Projects EC contribution of EUR 1 to 3 million with upper eligibility limit of EUR 5 million ( also small Coordination and Support Actions )
28
FP7-Space Space-based applications at the service of the European Society (principally Kopernikus) Space-based applications at the service of the European Society (principally Kopernikus) R&D strengthening Space foundations R&D strengthening Space foundations Cross-cutting issues SPA.2009.2.(1 & 4) 5 MEur SPA.2009.2.( 2 ) 9 MEur
29
Space Foundations (SSF) Research in Space Exploration Upstream high risk research aimed at improving capabilities for exploration New concepts in Space Technologies and Critical Components European strategic non-dependence Research in Space Exploration Support to NMS and Associated States Fostering international cooperation and addressing niche markets
30
Topic SPA.2009.2.1.01 – Space Exploration … capability for interplanetary travel … … access to planets surfaces … … capability to move, to select and collect and finally return samples … … perform their analysis in the frame of Space Exploration activities… Collaborative Projects EC contribution of EUR 1 million with upper eligibility limit of EUR 2 million (also small Coordination and Support Actions )
31
Topic SPA.2009.2.2.01 – Space technologies … emphasis is on the expected medium term impact for Europe to develop or regain the capacity to operate independently in space … … specifically : Digital components, Microwave components … … space evaluation and qualification … … utilisation of commercially avail. technologies … Collaborative Projects EC contribution of EUR 1 million with upper eligibility limit of EUR 2 million (also small Coordination and Support Actions )
32
Topic SPA.2009.2.4.01 – Support to new EU-Member States/Associated States … establishment of strong and long-term relations … … future potential for a continuous and sustainable contribution in major on-going and planned European space programmes … Coordination and Support Actions with EC contribution upper eligibility limit of EUR 1 million
33
FP7-Space Space-based applications at the service of the European Society (principally Kopernikus) Space-based applications at the service of the European Society (principally Kopernikus) R&D strengthening Space foundations R&D strengthening Space foundations Cross-cutting issues SPA.2009.3.2 3 MEur SPA.2009.3.5 1 MEur
34
Horizontal/cross-cutting issues SPA.2009.3.2 International cooperation Special attention to Kopernikus Africa Coordination actions to support EU-AU Consultation process SPA.2009.3.5 Studies in support of European Space Policy Focussing on implementation and follow-up of ESP Support Actions studying Socio-economic dimension of activities and priorities
35
Kopernikus and Africa, guidelines for CSAs (1 ): To prepare the ground for the implementation of the Action Plan, along the declaration of Lisbon on GMES and Africa Close cooperation with the EU-AU Working-group on GMES and Africa (DG-ENTR GMES Bureau will be the focal point) To involve African user communities Supporting on-going initiatives in reaching a regional or pan-African dimension Networking of African and European centres of excellence
36
Kopernikus and Africa, guidelines for CSAs (2): Exchange of know-how and requirements between Africa and Europe Focus on the deployment of services, while considering the underlying infrastructure and expertise that will be needed to access and operate those services (capacity building) Thematic areas: monitoring of Natural resources, natural hazards, water management, desertification and preparing for climate change, prevention of conflicts, food security, monitoring of marine and coastal waters.
37
Timeline for the Second Space call: 3 September 2008 publication ec.europa.eu/enterprise/space_research cordis.europa.eu/fp7 4 December 2008 deadline Jan-Feb 2009 evaluation
38
FP7 « SPACE » Support to GMES Space Component Programme
39
FP7 funding in ESA ITTs Supporting the Kopernikus Space infrastructure EC money managed by ESA in line with the EU-ESA delegation agreement 45% of FP7 Kopernikus budget (EUR 624 million 2007-2013 in net terms)
40
Space Infrastructure In Situ Infrastructure OBSERVATION INFRASTRUCTURE CORE SERVICES DOWNSTREAM SERVICES How do ESA ITTs fit into the global Kopernikus architecture? Added Value Chain Users Security Emergency Atmosphere Marine Land d.s.
41
ESA MISSIONS 5 Lines of missions - Sentinels Sentinel 1 – SAR imaging –All weather, day/night applications, interferometry Sentinel 2 – Multispectral imaging –for land applications, e.g. urban, forest, agriculture, etc. –Sentinel 3 – Ocean & Land monitoring –Wide-swath ocean color, vegetation, sea/land surface temperature, ocean altimetry Sentinel 4 – Geostationary atmospheric –Atmospheric composition monitoring, trans-boundary pollution Sentinel 5 – Low-orbit atmospheric –Atmospheric composition monitoring
42
Community procurement principles (FP7 States) ITTs published on Cordis ESA rules (ESA States only) ESA Member States funding (~1.7 B€) FP7 funding (710M€) ESA only EC-ESA joint funding GMES Space Component Programme See ec.europa.eu/enterprise /space_research Contains: S1,S2,S3 Subcontracts PDGS Development/ Pre-Operations Launching activities Accompanying Activities
43
ec.europa.eu/enterprise/space_research
44
Listings of past, current and future Invitations to Tenders (ITT) Title Status (closed,open,intended) Industry ITT no. « 08-.nnn » EMITS No. « AOnnnnn » Tendering Entity Open / close date Link to ESA’s tender information
45
https://gmesfp7emits.esa.int
46
https://emits.esa.int
47
How to deal with ITTs Always double check eligibility in the letter of invitation It is mandatory to register with EMITS The resulting bidder code is necessary to submit an offer - It is mandatory to register with EMITS It is highly advisable to register as a potential tenderer with the tendering entity
48
Summary of this presentation FP7 Space Programme Background Division of labour between EC and ESA The 2 nd FP7 Space call for downstream services The global GMES architecture ESA ITTs The GMES Space Component How to access tenders
49
Thank you for your attention Hugo Zunker Space Research and Development Unit Hugo.Zunker@ec.europa.eu
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.