2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer
2
Issue With rising material and construction costs and declining funding it is essential that ODOT’s Highway construction and maintenance programs ensure that all available dollars are directed to activities and projects which optimize the Highway System condition as a whole.
3
1R Technical Bulletin
4
1R Program Components Annual bucket for preservation projects requiring only a single lift of paving. Anticipated savings from developing projects under 1R standards (currently set at $7M/year) would be used to address substandard priority safety features.
5
1R Projects Address pavement feature only Adversely impacted safety features need to be addressed like raising a guardrail to accommodate an overlay. Safety features addressed through separate program based on priority needs.
6
1R Standard Approval Process Region Pavement Services Unit FHWA
7
Pavement Details
9
Eligible Projects Single paving lift Non-structural inlay or overlay (2 to 3”) Leveling course allowed
14
Safety Feature Details
15
1R Roadside Inventory ROADWAY TYPICAL SECTIONS DESIGN CONSIDERATIONS (ADT – Speed) STRUCTURES SIGNS GUARDRAIL DRAINAGE FACILITIES PEDESTRIAN & BICYCLE FACILITIES SPECIAL PROBLEMS (Clear Zone Safety Hazards)
16
Statewide Traffic Barrier Inventory
17
230 Transition
18
High Priority Barrier Features 1 - Un-connected Transitions 2 - Pre 230 Terminals 3 - Pre 230 Transitions 4 - Tongue & Groove Concrete Barrier 5 - Pre 230 Type 1 and 1A Guardrail 6 - Pre 230 Type 2 Guardrail 7 - Pre 230 Impact Attenuators 8 - Rebar Pin & Loop Concrete Barrier 9 - 4 Loop Pin & Loop Concrete Barrier 10 - 230 Transitions 11 - 230 Impact Attenuators
19
Cost to Upgrade High Priority Features HIGH PRIORITY FEATURENUMBERCOST UN-CONNECTED TRANSITIONSIncluded in Pre-230 Terminals PRE-230 TERMINALS11,100 units $45,000,000 PRE-230 TRANSITIONS 1,000 units $ 6,000,000 T&G CONCRETE BARRIER 7 miles $ 3,000,000 PRE-230 Type 1 GUARDRAIL 140 miles $19,000,000 PRE-230 Type 2 GUARDRAILIncluded in Pre-230 Type 1 PRE-230 IMPACT ATTENUATORS 60 units $ 3,000,000 TOTAL $76,000,000
20
Required 1R Items Replacement of striping and delineation Gravel shoulders matched to paved surface elevation Replacement of signal loops if impacted Replacement of rumble strips Adjust existing features as needed Vertical clearance policy followed Traffic mobility standards followed
21
Benefits of a 1R Program Provides opportunity to plan and deliver projects strategically. Allows more timely development of single lift preservation projects. Simplifies project delivery – only impacted features are addressed.
22
Questions?