Presentation is loading. Please wait.

Presentation is loading. Please wait.

MayJunJulAugSepOctNovDec Phase 2 - Electrical May 19 Material Available Jul 28 Testing Completed Aug 9 Units Available Aug 28 Certification Sep 30 Production.

Similar presentations


Presentation on theme: "MayJunJulAugSepOctNovDec Phase 2 - Electrical May 19 Material Available Jul 28 Testing Completed Aug 9 Units Available Aug 28 Certification Sep 30 Production."— Presentation transcript:

1 MayJunJulAugSepOctNovDec Phase 2 - Electrical May 19 Material Available Jul 28 Testing Completed Aug 9 Units Available Aug 28 Certification Sep 30 Production December 4, 2016 Phase 1 - Mechanical May 11 Units Available Aug 3 Drawing's Released Aug 13 Build Start Aug 25 Conditional Release Sep 3 CUA Pending Sep 16 Performance Results Oct 16

2 To change and update this template automatically, download the free Office Timeline PowerPoint add-in! Office Timeline is a free, award winning, timeline maker that's really easy to use.  Simple, easy-to-use wizards.  Professional, quick results.  Built directly into PowerPoint

3 Download Now www.OfficeTimeline.com/download Get the Free Edition Now Easily edit this template and create other beautiful timelines quickly, right inside PowerPoint. Copyright © 2012, Office Timeline, LLC. All rights reserved.


Download ppt "MayJunJulAugSepOctNovDec Phase 2 - Electrical May 19 Material Available Jul 28 Testing Completed Aug 9 Units Available Aug 28 Certification Sep 30 Production."

Similar presentations


Ads by Google