Download presentation
Presentation is loading. Please wait.
Published byGervase Parsons Modified over 9 years ago
1
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 1 Scene setting for Episode 3 Philippe Leplae EUROCONTROL Episode 3
2
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 2 Scene setting for EP3 Objectives Structure What we did
3
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 3 Episode 3 context
4
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 4 Episode 3 context 200520062007200820092010 SESAR definition phase EP3 Proposal EP3 updated Proposal EP3 Kick off EP3 Suspension EP3 Unfreeze EP3 closing EP3 phase 1 EP3 phase 2 Start S-JU Work programme Re-alignment to SESAR CONOPS Synchronization With S-JU Work programme
5
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 5 Initial Episode 3 19 Validation Areas designed to validate C-ATM OSED’s Mature concept for mid–term (2013) around NOP, SWIM and TTA Initial re-alignment over-estimated maturity of SESAR concept Budget 33 M€ 2 validation cycles over 40 months
6
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 6 Streamlined Episode 3 Dry run a full concept validation process Set up a project structure able to gather full concept validation results and create a system view Provide feedback on new validation methods Gaming Prototyping Use of expert groups Macro-modelling Budget 19 M€
7
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 7 Scene setting for EP3 Objectives Structure What we did
8
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 8 Episode 3 WBS WP2 System Consistency ERC WP0 Management ERC WP3 Collaborative Planning AENA WP4 En-route, & Traffic Management DFS WP5 E-TMA / TMA & Airport NATS 2.2 Concept clarification ERC 2.2 Concept clarification ERC Requirements 2.3 Validation process ERC 2.3 Validation process ERC Validation 2.4 Global assessments ERC 2.4 Global assessments ERC 2.5 Result consolidation ERC 2.5 Result consolidation ERC WP6 Technological Enablers AIRBUS Management Reporting ManagementOperational validationsTechnology validationOverall consistency
9
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 9 Episode 3 consortium WP eladers WP Leaders ANSP’s Research Industry Other companies + Airlines
10
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 10 Episode 3 consortium WP eladers Management System view Technical Assessment Collaborative Planning En Route TMA & Airport
11
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 11 Managing distributed partners The Episode 3 navigator allows structuring information for easier sharing
12
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 12 Managing distributed partners The Episode 3 website allows collaborative work in a distributed way
13
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 13 Managing distributed partners The Episode 3 website allows collaborative work in a distributed way
14
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 14 Scene setting for EP3 Objectives Structure What we did
15
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 15 Project principles of organization Validation strategy Initial DOD’s Performance Framework Initial DOD’s Performance Framework WP Validation strategy WP Validation strategy Scenarios and exercises needs clarification Detailed exercise plan Detailed exercise plan Run exercise Run exercise Results analysis Impact on scenarios Review results Impact on scenarios Review results WP report Including DOD’s recommendations WP report Including DOD’s recommendations Update DOD’s Consolidate performance results Update DOD’s Consolidate performance results Consolidated report Consolidated report WP2WP2 WP x.2 & x.4 Expert Group WP x.3.y But the reality is much more complex….
16
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 16 Operational validation Collaborative planning Balancing network in case of sudden capacity shortfall Negotiation for TTA allocation AMAN/DCB boundary Actors roles definition Gaming exercise followed by process modelling Study of airspace management in the SESAR context Computation of VGA Negotiation with airlines, military, ANSP’s Gaming exercise
17
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 17 Operational validation Collaborative planning Study of airport CDM at Palma Expert group supported by Fast Time tool Gaming around Airport Operations Centre
18
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 18 Operational validation En Route Gaming on separation management Tasks and responsibilities in the SESAR context Paper based gaming + process analysis Fast time on strategic deconfliction Use of mini-slots to de-conflict Study stability of method
19
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 19 Operational validation En Route Prototyping sessions on 4D trajectories No route structure Adherence to CTA Context MUACC airspace
20
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 20 Operational validation TMA & Airport Runway capacity increase (Brake-to vacate, TBS,ILS protection zone, etc…) Fast Time – TAAM Study of CDA’s in multi-airport TMA’s Fast Time – TAAM Study of 3D-PRNAV, CDA’s and approach tools Fast Time - RAMS PLUS Context Roma TMA
21
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 21 Operational validation TMA & Airport Prototyping session on TMA 3D PRNAV-Point Merge Combination with CDA’s ENR traffic delivered with TTA Context Dublin and Roma airspace
22
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 22 Industrial assessment Initial 4D (Trajectory exchange + CTA/RTA) Issues of FMS precision and MET impact 3 ASAS manoeuvres Results: Usability & Performance of industrial prototypes Integration of 3 platforms (EUROCAT, AIRLAB, EPOPEE)
23
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 23 Integration Validation Exercises Final DOD’s version Validation Exercises Performance Model Integrated Risk Picture E x p e r t g r o u p s m e e t i n g s W P 2
24
Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 24 Summing up Objectives: A project built over years to optimally serve SESAR Structure: Most partners also SESAR partners A project structure similar to SESAR Development Phase What we did: Mostly around SESAR operational validation, trying a number of techniques for SESAR WP 4, 5, 6, 7 A launching pad for SESAR WP 9 and WP 10 Providing a blueprint to integrate concept wide results
25
Thank you Thank you !
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.