Download presentation
Presentation is loading. Please wait.
Published byBenedict Hunter Modified over 9 years ago
1
Project: Flexible Manufacturing System Manufacturing of segment display units
2
Project: Flexible Manufacturing System Station 1 “Drilling” PLC S7 Station 1 “Drilling” PLC S7 Station 2 “Pin-Insertion” PLC S7 Station 2 “Pin-Insertion” PLC S7 Station 3 “Segment-Mounting” PLC S7 Station 3 “Segment-Mounting” PLC S7 Station 4 “Quality” PC & PLC S7 Station 4 “Quality” PC & PLC S7 Safety logic Failsafe PLC Safety logic Failsafe PLC Shop floor control PC (WINCC) Shop floor control PC (WINCC) Safety-Bus Profi-Bus Overview
3
Project: Flexible Manufacturing System Electrical control cabinet: Failsafe PLC FS-PLC T1: 230V T2: 24V Fuses Power Relais Connection Terminals
4
Project: Flexible Manufacturing System PLC S7 DI8O8 Emergency stop relais X3 X0 Safety-Bus Electrical control cabinet: Station 1...4
5
Project: Flexible Manufacturing System Conveyorbelt Operating mode Manual / Autom. ? General control sequence FS-PLC Shop floor control Station 1 “Drilling” Start Home- position ? Unblocking Conveyorbelt running Safety-BusProfi-Bus
6
Project: Flexible Manufacturing System Shop floor control Station 1 “Drilling” FS-PLC “Drilling” Order input Shopfloor-control Order dates Preparing carriersStop next pallet Station 1 “Drilling” Shop floor control PalIet code Status General control sequence Read and return pallet code
7
Project: Flexible Manufacturing System Shop floor control Station 2 “Pin insertion” FS-PLC Station 2 “Pin insertion” Read and return pallet code Shop floor control Pallet code Order data Station 2 “Pin insertion” Pin insertion Status Shop floor control General control sequence
8
Project: Flexible Manufacturing System FS-PLC Station 3 “Segmentmounting” Shop floor control Station 3 “Segmentmounting” Emergency- Stop FS-PLC Emergency- Stop Shop floor control Read / return Palletcode Shop floor control Mounting Emergency Stop General control sequence
9
Project: Flexible Manufacturing System Shop floor controller PC (WINCC)
10
Project: Flexible Manufacturing System Drilling-unit Robot Order dates PLC-S7 Get blanc carrier Station 1: Control sequence drillingCarrier on pallet Pallet code
11
Project: Flexible Manufacturing System Shop floor controller PC (WINCC) Pallet code Pallet code
12
Project: Flexible Manufacturing System Station 2: Control sequence Stop pallet Pin feeding Insert pins
13
Project: Flexible Manufacturing System Shop floor controller PC (WINCC) Pallet code
14
Project: Flexible Manufacturing System Sequence: Segment feed Release pallet If new Pallet Mounting Read / return palletcode If Pushbutton: “Stop” wasn’t pressed Singulize pallet Clamp pallet Move gripper and pick segment Move gripper to carrier Place segment on carrier Unclamp pallet Release pallet
15
Project: Flexible Manufacturing System Segment feed Read / return pallet code If new pallet Mounting Release pallet
16
Project: Flexible Manufacturing System Shop floor controller PC (WINCC) Pallet code
17
Project: Flexible Manufacturing System Pallet code PC Image processing Order dates PLC - S7 Order dates Station 4: sequence Start Signal
18
Project: Flexible Manufacturing System Image processing:
19
Project: Flexible Manufacturing System PC Image processing PLC - S7 Station 4: sequence Fertig Start- Signal Result Ready
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.