PURPOSE Obtain public input for improving Town Hall DURHAM TOWN HALL FORUM
3
DURHAM TOWN HALL FORUM BACKGROUND Existing Building Conditions Lack of Adequate Space Opportunity to Relocate to Bank Building Why Improve Town Hall?
4
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Lead Paint/ Peeling Paint
5
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Roof Leaks
6
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator
7
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator Floor Levels
8
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator Floor Levels Doors/Hardware
9
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator Floor Levels Doors/Hardware Exit Stairs Enclosure and Pitch
10
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator Floor Levels Doors/Hardware Exit Stairs Enclosure and Pitch No Sprinkler System, Assembly Limit 1-Story
11
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Code Issues ADA Compliance Elevator Floor Levels Doors/Hardware Exit Stairs Enclosure and Pitch No Sprinkler System, Assembly Limit 1- Story Accessible Ramp at Exit
12
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Air Quality No Ventilation System
13
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Air Quality No Ventilation System Mold/Mildew
14
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Basement Slab
15
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Poor Energy Performance Lack of Insulation/ Vapor Barrier
16
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Poor Energy Performance Lack of Insulation/ Vapor Barrier Windows Not Working, Poor Quality
17
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Poor Energy Performance Lack of Insulation/ Vapor Barrier Windows Not Working, Poor Quality Window Air Conditioners
18
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Poor Energy Performance Lack of Insulation/ Vapor Barrier Windows Not Working, Poor Quality Window Air Conditioners Light Fixtures
19
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Electric Service 200 amps
20
DURHAM TOWN HALL FORUM DATA COLLECTION Existing Building Conditions BACKGROUND Repair Porches
21
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Town Clerk/Tax Collector Vault
22
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Town Clerk/Tax Collector Vault Office
23
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Building/Planning/ Assessing Reception
24
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Building/Planning/ Assessing Reception Building Inspector Office
25
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Building/Planning/ Assessing Reception Building Inspector Office Planner Office
26
DURHAM TOWN HALL FORUM DATA COLLECTION Lack of Adequate Space BACKGROUND Meeting Rooms
27
DURHAM TOWN HALL FORUM DATA COLLECTION Opportunity to Relocate BACKGROUND The Bank building became available for purchase. The Town decided to relocate Town Hall to Bank site. Building Image Location Condition Health of Staff Energy Conservation Long Term Tax Benefit
28
DURHAM TOWN HALL FORUM Reviewed Space Needs Developed Program (50-75 Year Solution) Prepared Design and Budget for 50-75 Year Solution (Option A) Developed Smaller Program (10-25 Year Solution) Prepared Design Options for 10-25 Year Solution (Options B, C, D) Prepared 1-5 Year Design Option (Option E) Evaluated Alternative Options Steps Taken BACKGROUND
29
DURHAM TOWN HALL FORUM Option A: 50-75 Year Solution Option B: 10-25 Year Solution, Reduced Size Option C: 10-25 Year Solution (Town Clerk/Tax Collector on Basement Level) Option D: 10-25 Year Solution (Town Clerk/ Tax Collector on First Floor) Option E: 1-5 Year Solution, Minimize Size and Cost Alternative Options Renovate Existing Building Construct New Building on New Site Construct New Building on Madbury Road at Library Redevelop Current Site/Town Hall in Commercial Complex Add Third Floor to Bank Building OPTIONS
30
DURHAM TOWN HALL FORUM Existing Building OPTIONS 5,689 SF Existing Floor Plans
31
DURHAM TOWN HALL FORUM First Floor Plan Option A OPTIONS
32
DURHAM TOWN HALL FORUM Second Floor Plan Option A OPTIONS
33
DURHAM TOWN HALL FORUM Basement Plan Option A OPTIONS
34
DURHAM TOWN HALL FORUM Site Plan Option A OPTIONS
35
DURHAM TOWN HALL FORUM Option A OPTIONS Cost Purchase Cost$ 745,000 Design and Construction Cost$ 2,461,245 Sale of Town Hall Income ($1,200,000) Net Cost (to be bonded)$ 2,006,245 Tax Impact Year 122¢/$1,000 Value Year 106¢/$1,000 Value Year 21-13¢/$1,000 Value
36
DURHAM TOWN HALL FORUM First Floor Plan Option B OPTIONS
37
DURHAM TOWN HALL FORUM Second Floor Plan Option B OPTIONS
38
DURHAM TOWN HALL FORUM Basement Plan Option B OPTIONS
39
DURHAM TOWN HALL FORUM Site Plan Option B OPTIONS
40
DURHAM TOWN HALL FORUM Option B OPTIONS Cost Purchase Cost $ 745,000 Design and Construction Cost $2,337,320 Sale of Town Hall Income ($1,200,000) Net Cost $1,882,320 Tax Impact Year 120¢/$1,000 Value Year 105¢/$1,000 Value Year 21-13¢/$1,000 Value
41
DURHAM TOWN HALL FORUM First Floor Plan Option D OPTIONS
42
DURHAM TOWN HALL FORUM Second Floor Plan Option D OPTIONS
43
DURHAM TOWN HALL FORUM Basement Plan Option D OPTIONS
44
DURHAM TOWN HALL FORUM Site Plan Option D OPTIONS
45
DURHAM TOWN HALL FORUM Option D OPTIONS Cost Purchase Cost $ 745,000 Design and Construction Cost $2,188,015 Sale of Town Hall Income ($1,200,000) Net Cost $1,733,015 Tax Impact Year 120¢/$1,000 Value Year 104¢/$1,000 Value Year 21-13¢/$1,000 Value
46
DURHAM TOWN HALL FORUM First Floor Plan Option E OPTIONS
47
DURHAM TOWN HALL FORUM Second Floor Plan Option E OPTIONS
48
DURHAM TOWN HALL FORUM Basement Plan Option E OPTIONS
49
DURHAM TOWN HALL FORUM Site Plan Option E OPTIONS
50
DURHAM TOWN HALL FORUM Option E OPTIONS Cost Purchase Cost $ 745,000 Design and Construction Cost $1,222,550 Sale of Town Hall Income ($1,200,000) Net Cost $ 767,500 Tax Impact Year 18¢/$1,000 Value Year 10-5¢/$1,000 Value Year 21-13¢/$1,000 Value
51
DURHAM TOWN HALL FORUM Alternative Options OPTIONS Renovate Existing Building Construct New Building on New Site (Cost) Construct New Building on Madbury Road at Library Redevelop Current Site/Town Hall in Commercial Complex Add Third Floor to Bank Building
52
DURHAM TOWN HALL FORUM DATA COLLECTION Renovate Existing Building OPTIONS Replace Roof Replace Siding, Add Insulation Replace Windows Repair Porches Install Basement Mud-Slabs (mold/mildew) Structural Repairs Add Ramp at Council Chambers Level Floors Code Compliant Stairs ADA Compliant Doors and Hardware Install Elevator Install Sprinkler System Install New HVAC System Upgrade Electric Service (Existing 200 Amp) Lighting Improvements Install Emergency Generator Expand Town Clerk/Tax Collector and Building/Planning/Assessing Improvements Required
53
DURHAM TOWN HALL FORUM Renovate Existing Building OPTIONS Cost Purchase Cost $ 0 Design and Construction Cost $1,456,920 Sale of Town Hall Income $ 0 Net Cost $1,456,920 Tax Impact Year 114¢/$1,000 Value Year 1010¢/$1,000 Value Year 21-4¢/$1,000 Value
54
DURHAM TOWN HALL FORUM Construct New Building on New Site OPTIONS Cost Purchase Cost $ 300,000± Design and Construction Cost $2,935,005 Sale of Town Hall Income ($1,200,000) Net Cost $2,035,005 Tax Impact Year 123¢/$1,000 Value Year 106¢/$1,000 Value Year 21-13¢/$1,000 Value New Site or Madbury Road
55
DURHAM TOWN HALL FORUM Redevelop Current Site OPTIONS Town Hall Located in Commercial Complex - Loss of Image and Character - Question of Ownership - Cost Similar to New Construction + Beneficial Tax Impact
56
DURHAM TOWN HALL FORUM Add Third Floor to Bank Building OPTIONS Issues - Structural Concerns, Earthquake Reinforcing - Add 4-Stop Elevator - Add Two Code Compliant Exit Stairs - Concern with Scale of Taller Building - No Anticipated Cost Benefit
57
DURHAM TOWN HALL FORUM Comparison of Costs OPTIONS Net CostTax Impact Year 1 Tax Impact Year 10 Tax Impact Year 21 Option A$2,219,59522¢ /$1,000 value 06¢ /$1,000 value -13¢ /$1,000 value Option B$2,109,69520¢ /$1,000 value 05¢ /$1,000 value -13¢ /$1,000 value Options C, D$1,972,76520¢ /$1,000 value 04¢ /$1,000 value -13¢ /$1,000 value Option E$767,55008¢ /$1,000 value -05¢ /$1,000 value -13¢ /$1,000 value Renovation$1,456,920 14 ¢ /$1,000 value 10 ¢ /$1,000 value -04 ¢ /$1,000 value New Construction $2,035,00523¢ /$1,000 value 06¢ /$1,000 value -13¢ /$1,000 value