Download presentation
Presentation is loading. Please wait.
Published byAugusta Freeman Modified over 9 years ago
1
Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench
2
Manage all aspects of your additional Capacity Requirements Update Work Centre capacity with capacity from PO Assign Personnel Numbers to Purchase Order and Capacity Generate Service Entry Sheets from Time Confirmations using Personnel Numbers Stop waiting on HR for Personnel Numbers Copyright © 2010ZPM Solutions. All rights reserved. Balance Labour costs within the correct period Translate Capacity Requirements to Purchase Orders Integrate with Site Induction requirements The Contractor Management Workbench ties together the different aspects of Contractor Management, including the Work Centre Capacity, Purchase Order, Time Confirmations, Personnel Numbers, Positions and Service Entry Sheets for the life of the additional Capacity Requirement.
3
Copyright © 2010ZPM Solutions. All rights reserved.
4
No need to reassign Operations to other Work Centres Updates the Capacity in you Work Centre Forces creation of Service Entry Sheets at the correct time Visibility for Induction Requirements Promotes collection of Time Confirmations Allows for the continuous use of the Scheduling Process
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.