Download presentation
Presentation is loading. Please wait.
Published byDestiny Powers Modified over 10 years ago
1
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, 24-25 March 2012
2
Break-out session III: Global and Local Stakeholder Consultation Processes [Module 3.3] Main issues discussed: Global and Local stakeholder consultation 1.Current guidance on local stakeholder consultation not adequate 2.Current CDM rules for SC validation are vague and do not provide guidance 3.Guidelines needed for DOEs to assess whether local SC is adequate 4.Example of DNA national approval process /enhanced involvement in consultation 5.Currently problems are encountered with Global SC process 6.Recommendations for Improvements to the Global SC process 7.Need for Grievance mechanism for affected stakeholders
3
Break-out session III: Global and Local Stakeholder Consultation Processes [Module 3.3] Action points / Recommendations: There is a welcome general consensus among stakeholder groups to improve current regulatory framework. Develop clear rules on how to conduct local stakeholder consultations; Potential to align with national regulations, via appropriate means in local language to relevant groups, reconsider timing of consultation (e.g., design phase, follow up - however conflict of interest and additional costs should be considered) Establish clear guidelines to enable DOEs to effectively assess/validate local stakeholder consultations Enhance guidelines for global stakeholder consultations/comments; provide notice of projects hosted to allow timely consideration, guidance for DOEs on treatment of non-project specific/non substantiated comments Establish a grievance mechanism for affected stakeholders
4
Break-out session III: Global and Local Stakeholder Consultation Processes [Module 3.3] Next Steps and the way forward… Concept note to be developed on local stakeholder consultation and global stakeholder consultation, based on the call for inputs and interim discussions CDM Roundtable for further consultation (May 2012 ) Recommendation to the Board (foreseen….. July 2012) Revised regulatory documents (Project Standard, Validation and Verification Standard)………( foreseen….Sept 2012)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.