Download presentation
Presentation is loading. Please wait.
Published byCory Hodge Modified over 9 years ago
1
1 HiLoad during DP Operation – November 2010 Docking and Attachment Test Norway - December 13, 2010
2
2 Approach to Submersible Barge on DP
3
3 Attachment System Activated Maneuvering of Barge by HiLoad DP
4
4 HiLoad during DP Operation – November 2010
5
5 First Ballast Test – Oct 2010
6
6 HiLoad during DP Operation – November 2010
7
7 HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP No. 1 at “Sea Trial Base” in Norway HiLoad DP at 42 m draught (138 feet) HiLoad DP No. 1 – In Operation
8
8 HiLoad DP No. 1 in Transit to Test Location on the West Coast of Norway HiLoad DP No. 1 at “Sea Trial Base” in Norway 28.0 m 27.0 m 42.0 m Min draught 17.0 m
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.