Download presentation
Presentation is loading. Please wait.
Published byLiliana Simpson Modified over 9 years ago
1
To reach your goal you must take the first step
2
There is only one boss. The CUSTOMER! And he can fire anyone in the company from the chairman on down, simply by spending his money somewhere else. SAM WALTON
3
96 % don’t complain about rude or discourteous service. 90 % will not buy again or come back. Each will tell at least 9 other people. 13% will tell more than 20 people. 96 % don’t complain about rude or discourteous service. 90 % will not buy again or come back. Each will tell at least 9 other people. 13% will tell more than 20 people. Tales of Unhappy Customers
4
Product Life Cycle AnnualSales AnnualProfits ProductPlanning Introduction Growth Maturity Decline
5
Step 1 Idea Generation Step 1 Idea Generation The Planning Process 20 -25 new ideas for every new product 20 -25 new ideas for every new product
6
Step 1 Idea Generation Step 1 Idea Generation The Planning Process Step 2 Screening Step 2 Screening Discard most ideas during screening Discard most ideas during screening
7
Threshold is 800 - reject alternative Preference Matrix Performance Criterion Weight Score Weighted Score Market potential 30 8 240 Unit profit margin 20 10 200 Operations compatibility 20 6 120 Competitive advantage 15 10 150 Investment required 10 2 20 Project risk 5 4 20 750
8
Step 1 Idea Generation Step 1 Idea Generation The Planning Process Step 2 Screening Step 2 Screening Discard most ideas during screening Discard most ideas during screening
9
Step 1 Idea Generation Step 1 Idea Generation The Planning Process Step 2 Screening Step 2 Screening Step 3 Development and Testing Step 3 Development and Testing Design prototypes Conduct Market tests Design prototypes Conduct Market tests
10
Step 1 Idea Generation Step 1 Idea Generation The Planning Process Step 2 Screening Step 2 Screening Step 3 Development and Testing Step 3 Development and Testing Step 4 Final Design Step 4 Final Design Pilot production, Promotion starts Pilot production, Promotion starts
11
Step 1 Idea Generation Step 1 Idea Generation The Planning Process Step 2 Screening Step 2 Screening Step 3 Development and Testing Step 3 Development and Testing Step 4 Final Design Step 4 Final Design
12
BREAK EVEN ANALYSIS Total Revenue = Total Cost P = F + c Q ( P - c ) Q Q= F Q = F be..
13
Total annual revenues Total annual cost Fixed Cost Dollars 400 300 200 100 25% 50% 75% 100% Loss Profit Break-even quantity % of capacity
14
Total annual revenues Total annual cost Fixed Cost Dollars 400 300 200 100 Break-even quantity % capacity 25% 50% 75% 100%
15
Total Cost of B Dollars 20000 15000 10000 5000 5000 10000 15000 20000 Break-even quantity units = Q Total Cost of A $70000 + $10 x = $50000 + $12 x $20000 = 2 x $10000 = x = Breakeven
16
Product Quality Reliability: Probability that a component (or several components working together) will function properly for a given period of time.
17
Reliability Reliability of System = Combined Reliabilities of all components or mathematically, R = R x R x R 1 23 s R =.9 x.8 x.99 =.713 = 71.3% s.9.8.99
18
Reliability R =.9 +.9 (1 -.9) x.8 +.8 (1 -.8) x.99 =.94 = 94 % s.9.8.99 If the system reliability is too low, we can improve it by building in redundancy in some or all of the components..9.8
19
Product/Process Matrix ProcessFocus IntermediateStrategy ProductFocus Volume/Standardization ProcessChoice HIGH LOW
20
ProcessFocus Volume/Standardization ProcessChoice HIGH LOW More customization More resource flexibility more labor intensive less vertical integration More customization More resource flexibility more labor intensive less vertical integration
21
Product/Process Matrix ProductFocus Volume/Standardization ProcessChoice HIGH LOW More standardization more capital intensive more vertical integration More standardization more capital intensive more vertical integration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.