Download presentation
Presentation is loading. Please wait.
Published byStanley Andrews Modified over 9 years ago
1
Innovative Solutions for Aviation 2 nd Annual Workshop Innovations In NAS-Wide Simulation In Support Of NextGen Benefits January 2010 Kenny Martin
2
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NextGen Requirements Functional Requirements Of NextGen Cross-Cutting Infrastructure/Enabler Programs ADSB SWIM DataComm NextGen Network Enabled Weather (NNEW) NAS Voice Switch RNAV/RNP Solution Sets TBOTrajectory Based Management CATM Collaborative ATM HDHigh Density Airports FLEXFlexible Terminals & Airports RWIReduce Weather Impacts SSESafety, Security, Environmental Performance FACTransform Facilities
3
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation ISA Software NextGen Activities Cross-Cutting Infrastructure/Enabler Programs ADSB SWIM DataComm NextGen Network Enabled Weather (NNEW) NAS Voice Switch RNAV/RNP Solution Sets TBOTrajectory Based Management CATM Collaborative ATM HDHigh Density Airports FLEXFlexible Terminals & Airports RWIReduce Weather Impacts SSESafety, Security, Environmental Performance FACTransform Facilities ISA Software Modeling Approach
4
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Approach To System-Wide Analysis Simulation Platform CHILL Simulation Components RAMS Plus NAS-Wide Fast-Time Model Multi-Sector Planner Trajectory Builder Conflict Detection & Resolution Components MONACO user-preferred flight plan optimization Complexity Analysis tool Evaluator Metrics Assessment Recent Example Applications MSP Coordination Analysis TBO in High Performance Airspace (HPA) SESAR Collaborative Network Planning (Gaming) ADSB 3nm Separation Assessment DataComm Segment 1 Benefits Supersonic Aircraft Impact Assessment ISA Software Modeling Approach
5
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation CHILL Agent-Based Modeling What is CHILL? Collaborative Human In the Loop Laboratory, supporting System-wide, Networked Agent-based Modelling Platform Implements SWIM and NNEW Functionalities Model-based and/or HITL (Gaming) Studies Collaborative ATM Trajectory-Based Operations Multi-Sector Planner MONACO system-wide DCB optimization User-Preferred Problem Solving Evaluator Metrics Assessment
6
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Features of CHILL Versatile collaborative platform for validation of advanced Air Traffic Management concepts Evaluate traffic demand and airspace/airport conditions, to support collaborative decision-making processes Promoting common situational awareness through SWIM Rapid sharing of changes to airspace, airport and traffic conditions to all subscribers Adapt CATM service based on operator preferences Maximize user opportunities to propose problem solutions Identify optimal solutions from multiple agents / participants Provide up to date and timely picture of the entire ATM network in support of collaborative traffic management initiatives that maximize airspace capacity and improve operational efficiency On-Demand NAS-Wide metrics CHILL Main Features
7
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation CHILL : Flexible Situation Awareness Flow Oriented Analysis Providing instantaneous information on a system-wide perspective Within any 4-dimensional element (airport, sector, FEA, FCA, waypoint, SUA, weather volume etc.) Quantify demand against available service levels in support of collaborative Demand-Capacity management Simple (GUI-based) or declarative language based flows Management solutions applied to all/part of any flow
8
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation CHILL : Traffic Management Planning Service-Oriented Solutions Matching service levels to demand Allow all participants including airspace users to assess potential overload issues together Supporting other capacity metrics Workload, Complexity, Fuel, Emissions… Applying user-preferred management initiatives Providing interactive trial planning features Assisting capacity balancing through automated tools Diverse set of solutions supported: Dynamic Airspace Allocation User-preferred rerouting Optimization of multiple rerouting portfolios Multi-pass flight dispatching and slot management MIT or Time-base Metering Equitable distribution of penalties Fine-tuning capabilities for improving efficiency
9
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation CHILL Mixed Fidelity Modeling Macroscopic and Microscopic Agents Matching fidelity of the model(s) to the validation requirements Example: RAMS Plus representing a range of fidelity
10
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation FAA Multi-Sector Planner (MSP) High Performance Airspace : TBO Assessment NASA N+3 Supersonic Aircraft Impact Assessment ADSB 3nm Separation DataComm Benefits Analysis SESAR Trajectory-based ATM Concepts SESAR ‘Episode III’ Collaborative Airspace/Network Management Validation Recent Validation Experiments
11
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation MSP acting in Area Flow Manager role Previous RTS participants felt Area Flow was more efficient (solve more problems further in advance) Multi-D could become unmanageable with high traffic loads potential for loss of situational awareness Investigate multiple MSP working across ATC Centers Fort Worth, Kansas City and Memphis centers 150 sectors, long inter-center boundaries, complex mix of traffic Dallas-Fort Worth, St. Louis and Memphis airports Atlanta, Chicago, Houston, Denver adjacent FAA Multi-Sector Planner
12
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Modeled 50 adjacent MSP’s Sectors grouped based on traffic flows for high and super-high airspace Major terminal regions excluded as they would have their own DST’s FL240-245FL345+ FAA Multi-Sector Planner
13
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Complex Experimental Platform 150 executive ATC controllers modeled using RAMS Plus agents 4 Major airports (DFW, DAL, STL, MEM) also modeled with RAMS Plus CHILL’s MSP Component: 50 MSPs MSP Workload Model Many agents with different levels of fidelity SIM-C (SWIM) Component Underlying Messaging Via SENS for service discovery / message exchange FAA Multi-Sector Planner
14
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation MSP Responsibilities Knowledge of traffic 45 minutes in advance If overload predicted, the MSP: –Finds flight(s) in sector during overload –Attempts to find suitable reroutes to reduce overload –If successful, coordinate with impacted MSPs »Upstream MSP, if reroute begins in another MSA »Downstream MSPs, if reroute enters a sector not previously in flight plan, within 40 minutes of start of reroute Other MSPs will accept reroute unless: –Reroute creates or worsens an overload in other MSA –Other MSP is too busy (using new MSP workload model) Executive controller action (conflict resolution) always cancels pending MSP trial plans FAA Multi-Sector Planner
15
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Key Findings Traffic balance improved with MSP: Stdev of peak % of MAP reduced by 50%. FAA Multi-Sector Planner
16
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Key Findings Overloads for entire region significantly reduced by MSP in all scenarios – More than 10x Reduction with traffic+40% scenario FAA Multi-Sector Planner
17
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Key Findings Traffic Demand across region is significantly better balanced – Example: Core 12-hour analysis period with traffic+40% scenario FAA Multi-Sector Planner Plus40 NoMSPPlus40 MSP SECTORSSECTORS
18
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Key Findings Around 50% of flight plan uplinks require coordination with ATC in another ATC center FAA Multi-Sector Planner
19
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation FAA TBO in High Performance Airspace HPA ConOps relies heavily on TBO HPA is defined as FL 340+ Airspace based on generic sectors and flexible airspace design principles TBO aircraft are RNAV and DataComm equipped 4D Trajectories –Basis for planning and control –Sent and received independently of ground navaids. –Include Controlled Time of Arrivals (CTA) at the entry and the exit of the high altitude airspace Intermediate waypoints CTA’s, if optionally defined, have less restrictive timing constraints High Performance Airspace: TBO
20
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Study Objectives Understand the expected benefits and risks on both users and service providers in terms of: –Capacity and throughput –Users operational cost in terms of punctuality, travel distance and fuel consumption –Sector conflict density and traffic complexity inherent to freedom to navigate outside structured routes. Implement a set of metrics to quantify: –Conflict geometry and attitude distribution –Traffic density and controlled flight hours in a given volume –Variation of demand and average transit time in a given volume High Performance Airspace: TBO
21
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Modeling Approach Use of Navigation Reference System (NRS) as the primary blueprint for direct routing in the high altitude airspace High Performance Airspace: TBO
22
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation TBO Application Every TBO aircraft follows a direct route in the high altitude airspace The two nodes of the direct routes are located by their respective NRS points TBO aircraft may still contain structured routes when passing through non-high altitude airspace Separation standards remain the same: 5 miles laterally/ 1000 feet vertically Entry Exit High Performance Airspace: TBO
23
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Validation Status Initial (baseline and variant) scenarios completed Metrics being reviewed with sponsors Initial report in progress Work will continue through 2010 High Performance Airspace: TBO
24
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic Objectives NASA research contract to investigate environmentally friendly supersonic airframe and propulsion concepts Develop technology maturation plans to make the concept a reality Goals: Achieve a NextGen Integrated Advanced Vehicle Concept - Operational in the 2030 – 2035 timeframe Assess the impact of the introduction of such vehicles within the NAS - Benefits, complexity, interaction with other traffic, possible ATC issues…
25
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic Experimental objective Develop N+3 aircraft performance models Incorporate N+3 operations in the traffic forecast Evaluate the impact of N+3 aircraft in the NAS Assuming the re-introduction of supersonic aircraft in the future NAS, what is the likely impact on: –Traffic in the initial acceleration phase (around 10000ft) –Traffic in the second acceleration phase (23000ft and climb to supersonic) –Air traffic complexity due to the N+3 traffic –Controller workload due to special procedures required to handle supersonic aircraft
26
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic N+3 Aircraft Performance Introduce supersonic aircraft performance models - based on N+3 aircraft mission profiles supplied by LM-Aero team - carefully calibrated to be representative of expected performance N+3 fast/time model climb-phase mission profiles (compared to A320 in orange)
27
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic N+3 Aircraft Performance Descent Phases Also Represented N+3 fast/time model descent-phase mission profiles (compared to A320 in orange)
28
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic N+3 Potential Operations Operational Range around 6500NM with 200 passengers Potential Applications »Major International Routes »Economically Viable Domestic Routes Research from the US OTA ‘Impact of Advanced Aircraft Technology’ report [Princeton, 1980] chapter 3 (variables affecting a supersonic transport market) suggests that “ An aircraft’s product is passenger (/ cargo) miles” “ There are 2 ways to improve productivity: 1) larger aircraft (more seats – same flying time) 2) faster aircraft (same seats – shorter flying time)” Both will improve the metric “PAX miles per hour”
29
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic Traffic based on 2008 ASDI recordings Cloned based on MITRE forecasts (approx 2% growth per year) to achieve 2030 traffic Airspace from current NAS (2008) 5NM separation standard No additional ATC/ATM concepts included Metrics to evaluate Traffic interactions (N+3 vs Conventional conflicts, particularly in acceleration phases) ATC Complexity ATC Controller workload Delays / On-Time arrival (particularly for N+3 operations)
30
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation NASA ‘N+3’ Supersonic Current Status Baseline 2030 (no supersonic) and variant (conventional + supersonic) scenarios completed Results being reviewed with contractual partners Final report due for publication end Feb 2010 Examples of potential International and Domestic Supersonic routes
31
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation ADSB 3nm Separation Problem Statement: Quantify Benefits of ADS-B In Terms of Reduction in En-route Separation Questions To Be Answered In terms of system throughput, do flights get through the system with less delay? How Do The Delay Benefits Reduce As With 3nm Flight Level Ceiling is lowered? Key Assumptions Enroute Separations Drive The Alternative Cases ADSB Is Modeled As An Enabler However: No Future Anticipated NextGen ConOps Behavior Is Introduced
32
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation ADSB 3nm Separation ADSB NAS-Wide Scenario Traffic Demand 2012: 60,699 Flights 2017: 67,180 Flights Full NAS Sectorization 4D Flight Profiles 4D Conflict Probe Wake Separations Conflict Resolutions Closely Spaced Parallel Routes Airport Capacity Model
33
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation ADSB 3nm Separation Airport Capacity Modelling Focus On OEP Airports For Metric Generation Used ATO-F FACT2 Arr/Dep Rates (arr/dep ops/hr) Rates => Input To Airport’s Time-Based Metering Feature Benefits Ensures Aircraft Enter Enroute At Realistic Rate Eliminates Need For Detailed Airport/Runway Operations In An Enroute View
34
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation ADSB 3nm Separation ADSB Results ADSB Metrics Enroute & Arrival Delay Sector Loadings ADSB Findings Reduced Separations Allow Flights To Get Through the Enroute Faster. Some of the gain/benefit is lost in transition from Enroute to Airport. Overall System Benefits Remains With Reduced Separations
35
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation DataComm – Segment 1 Benefits Datacomm Segment 1 Benefits Focus On Controller Communications Voice Vs DCL Revised Departure Clearance Scope: IAH Airport Ground Movements Gate, Runway, SID/STAR Operations Question To Answer: Do DCL-Equipped Aircraft Take Off Any Faster Than Non-Equipped Aircraft in a revised departure clearance situation?
36
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation DataComm – Segment 1 Benefits Datacomm Segment 1 Benefits Revised Departure Clearance Situation High TMI Day When Departure Gates Are Closed Example: Northern Flows (departure gates) from IAH into DFW are closed. Revised departure clearances necessary for all flights using the closed gates who have received their PDC (pre-departure clearance) Today’s situation requires controller to go sequentially down a list of flights and transact the revised clearance departure by voice. This results in a significant taxi-out delay.
37
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation DataComm – Segment 1 Benefits Datacomm Segment 1 Benefits Locations Of Flights When Revised Departure Clearances Are Needed
38
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation DataComm – Segment 1 Benefits Datacomm Segment 1 Process Scenarios Equipage at 0%, 30%, 60% and 100% Baseline against “good” day, and then instigate convective weather impacts. Simulate IAH, and metroplex IAD/BWI/DCA Design Extrapolation Process For NAS-Wide Benefits in support of FID. Current Status Airport Simulation Results In Progress Extrapolation Process Being Designed
39
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation SESAR Trajectory-based ATM Objectives Based on 2012 traffic in the European Airspace investigate the feasibility, impact and potential benefit of 4D Trajectory- based operations: –Using pre-flight Target Time of Arrival (TTA) for Capacity Demand Planning (Reference Business Trajectory RBT- Constraints) –Using revised TTA’s following take-off –Allocating dynamic Controlled Time of Arrival (CTA) for key points during flight (e.g. entry to arrival management systems) –Using aircraft performance variation to try to respect TTA’s of all kinds.
40
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation SESAR Trajectory-based ATM Modeling Features RBT (pre take-off) constraint modelling TTA model including heuristic and deterministic a/c performance management to respect target time ‘windows’ FMS model to incorporate different TTA capabilities Dynamic CTA modeling including time-base meters for entry to TMA system models Unexpected weather / other noise modeling to perturb TTA plans Impact of Non-homogeneous traffic mix (e.g. FMS-based CTA capable, Manual CTA with ATC assistance, non- compliant) TTA compliance cancelled during ATC separation intervention TTA recovery mode (if possible) following resolution
41
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation SESAR Trajectory-based ATM Typical Metrics Considered Conformance to initial target time constraints Conformance to TTA following take-off Impact of departure (taxi/take-off queue) delay Dynamic CTA conformance Failures to achieve dynamic CTA (+ reasons) Impact of ATC Intervention Ability to recover TTA following interventions Compliance rates –With speed management –Without speed management –Average speed changes Impact of ‘unexpected weather’ + recovery rates Impact on fuel use ATC workload due to target time management
42
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation SESAR Trajectory-based ATM Status Initial report delivered to client Awaiting formal feedback Recommendations include –Additional experiments to include improved TFM / AMAN models –Improved fuel assessment models –Enhancement of modeling features
43
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation SESAR Episode II Gaming Exercises Gaming Exercises For SESAR/EP3 Validation of Concepts Analysis of SESAR Airspace Management Concepts using Interactive Gaming Scenarios Evaluation of different gaming strategies Supported 6-8 operational (HITL) positions 1 Game master, 1 Network Manager, 1 Regional Manager, 1 Military, 2 AOC positions Final report currently in review by European Commission
44
Innovations In NAS- Wide Simulation GMU Jan 27/28 2010 © 2010 – ISA Software Innovative Solutions for Aviation Future Activities What’s Planned For 2010? Additional MSP Simulations –Expand 2008 MSP Analysis to NAS-Wide –Consider Data Com between Flight deck and MSP Assessment of UAV impacts in The NAS Continue TBO Validation Data Com Segment 1 & Segment 2 Benefits Support to SESAR system-wide TBM concept validation Benefits To NextGen Modeling Efforts Continued Development & Enhancement Of CHILL- compatible tools Integration of 3rd Party Tools Within CHILL Cross-Program (USA/Europe) Sharing Of Applications –Scenarios, metrics, behaviour, etc.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.