Presentation is loading. Please wait.

Presentation is loading. Please wait.

0 2009 IEEE BTW Update Fort Collins, Colorado September 16, 2009.

Similar presentations


Presentation on theme: "0 2009 IEEE BTW Update Fort Collins, Colorado September 16, 2009."— Presentation transcript:

1 0 2009 IEEE BTW Update Fort Collins, Colorado September 16, 2009

2 1 IEEE Board Test Workshop Update Agenda –iNEMI Test TIG Update –2010 Test Projects

3 Introductions Board & Systems Test TIG Chair: Rosa Reinosa (HP) Co-Chair: James Grealish (Intel)

4 Objective & Scope Test To improve the effectiveness of the test process and the quality of electronic products in a global manufacturing environment Scope includes test technology and process improvement for boards and systems (e.g. automated inspection, electrical test, boundary scan, functional test, system test)

5 Test TIG Projects 2010 Board Flexure Initiative Chair: Rosa Reinosa (HP) Co-Chair: Alan McAllister (Intel) TEST TIG Chair: Rosa Reinosa Co-Chair: JJ Grealish Boundary Scan (Phase II) Chair: Phil Geiger (Dell) Co-Chair: Steve Butkovitch (Cisco) BIST Chair: Zoe Conroy Co-Chair: TBD Test Economic Model (Phase II) Chair: TBD Co-Chair: TBD

6 Summary of 2009 activities Accomplishments Completion of iNEMI 5 Year Test Technology Roadmap to be published by iNEMI Completed gap analysis Identified and reviewed proposals for 2010 projects Completed Functional Test Coverage project

7 Board Flexure Initiative Project 2009 Update New Spherical Bend Test Method Standard (IPC/JEDEC 9707) is being completed Feedback from JEDEC and IPC 6-10d committees has been gathered Proposal will go for ballot in IPC & JEDEC in Oct 2009 Phase II Starting in 2010 Goal: Update IPC 9702 (Monotonic Bend Test Method) and IPC 9704 (Strain Gauge Standard)

8 Boundary Scan Project 2009 Update Industry Survey (completed) Survey analysis (completed) ITC paper (To be published) Move forward recommendations Phase II To be determined

9 Functional Test Coverage Project 2009 Update Project has been completed Webinar held on 8/12/09 (hosted by iNEMI) Results will be made available to iNEMI participating companies Completed in 2009

10 BIST Project New in 2010 Currently in project definition phase Need more companies to join Chair: Zoe Conroy from Cisco (zfconroy@cisco.com) Introduced by Huawei Potential Project Steps: Survey (current state of BIST in the industry) BIST as an ICT alternative Investigation Development of Related Standards New BIST Board Level Standard Proposal White Paper

11 iNEMI Test Cost Model (Phase II) New in 2010 Seeking to optimize iNEMI Test Cost Model Currently in project definition phase Need more companies to join Contact: Haley Fu if interested (halfu@nemi.org) Introduced by Huawei


Download ppt "0 2009 IEEE BTW Update Fort Collins, Colorado September 16, 2009."

Similar presentations


Ads by Google