Download presentation
Presentation is loading. Please wait.
Published byElwin Tate Modified over 9 years ago
1
Stefan Campbell: TEAM LEADER Carlos Celada:CHIEF ENGINEER Chris Villani:ELECTRONICS ENGINEER Laurel Weiske:CAD/CAM SUPERVISOR *All members will be equally involved in fabrication processes supervised under the chief engineer **Issues involving controls will be addressed by the electronics engineer Team MIEUX Positions
2
TEAM MIEUX GANNT CHART ASME PROJECT
3
Preliminary Design Review Topic Schedule Tentative PDR Topics August 26: Team Organization and PDR Scheduling August 31: Design Requirements, Specifications and Constraints September 7: Key Design Issues (as considered in individual concept proposals) September 14: Team Concept Proposal September 21: System Mobility September 28: Mechanical Unloading System (Rice Transportation) October 5: Motor and Servos (Specifications and Design Drivers) October 12: In House Part Design (Pro/Engineer Designs and CAD/CAM) October 26: Bill of Materials (Vendors, Cost, Part Numbers, Fabrication) November 2: Outstanding Design Issues November 9: Detailed Product Proposal (Exploded Drawings of Assembly and Complete Fabrication Plan) November 16: Demonstration of Electronics
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.