Our Summer Vacation Capital Projects Our Summer Vacation by Tamela, John, Dianne and Carrie Capital Projects Our Summer Vacation by Tamela, John, Dianne.

Similar presentations


Presentation on theme: "Our Summer Vacation Capital Projects Our Summer Vacation by Tamela, John, Dianne and Carrie Capital Projects Our Summer Vacation by Tamela, John, Dianne."— Presentation transcript:

1 Our Summer Vacation Capital Projects Our Summer Vacation by Tamela, John, Dianne and Carrie Capital Projects Our Summer Vacation by Tamela, John, Dianne and Carrie

2 Our Summer Vacation BHS Photo Lab A full rehabilitation. New flooring, paint, refinished cabinets (in-house), tables, chairs, computers and IT infrastructure. “Moving into Room 324 with the new digital lab, darkroom and studio has already started to enhance my curriculum. First, it has given new life to my teaching, and I have been doing lots of research to see how others are teaching film photography.” -Janet Neuhauser before, dingy, pre-asbestos remediation

3 Our Summer Vacation BHS Tennis Courts New playing surfaces, nets, fencing, drainage, improved ADA access, and seating replaced the old cracked/slumping lower courts that were approaching 25 years old. The upper courts also received new playing surface to match the US Open Green/Blue colors along with new bleachers, paths and improved drainage. The Courts are designed to USTA standards and also include new power and a drinking fountain. Adjacent vegetation-buffer cleaned-up and revitalized. ugh! Old, worn-out, cracked and unplayable

4 Our Summer Vacation Woodward Commons Fresh paint and base throughout, visually updated, fresh and clean. Heavily-worn, outdated original paint (1995)

5 Our Summer Vacation Sakai Painting Wall repair and fresh paint cleans up a space that has been untouched since opening in 1999. Before: Incredibly beaten interior walls had not been touched since 1998

6 Our Summer Vacation Ordway Portables D-H Relocation of portable classrooms G/H, formerly at BHS, increases teaching space at Ordway. New paint gives the portable a fresh look. New HVAC units installed in adjacent portables D-E improve efficiency and indoor air quality. Before at BHS “in flight” After at Ordway

7 Our Summer Vacation Ordway Quiet Room A new room within a room provides needed quiet space for Special Education.

8 Our Summer Vacation Woodward Library Removal of underutilized cabinetry and new carpet in library provides opportunity for more open floor area adjacent to windows for group study. Cabinets re-purposed for the robotics program at Woodward. Add Woodward Library and Robotics photos Before After

9 Our Summer Vacation K-4 STEM Program Rooms As a part of the new K-4 STEM program, three classrooms at Blakely, Ordway and Wilkes were redefined. Over 200 individual pieces were organized for each space including storage, desks and chairs. New cabinetry was built in-house of sustainable materials in a modular fashion to aid in future repurposing. Before: old, worn-out and ill-sized cabinets Before After

10 Our Summer Vacation Transportation Bldg. A New floor finish, paint, HVAC (there was none) and furnishings transformed “sad to happy.” Ack! Help! Before…

11 Our Summer Vacation Transportation Bldg. B

12 Our Summer Vacation Discovering new uses … The GLAM Gals and meeting new friends…

13 Our Summer Vacation Capital Projects Our Summer Vacation The End  Capital Projects Our Summer Vacation The End 