Download presentation
Presentation is loading. Please wait.
Published byShanon Ross Modified over 9 years ago
1
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 1
2
Reminder: MIG/BI GroupReminder: MIG/BI Group F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 2
3
Magnets (PF Coils) Awarded: Winding tooling {OPE-463]: signed with Sea- Alp consortium on 8 th of May On-going: Impregnation & Additional tooling [OPE- 559] Under evaluation: Site & Infrastructure Management [OPE- 568] Under preparation: Manufacturing and cold test [OPE-570](CFT 11/2014) Cold test engineering study and facility construction [OPE-585]-cf market survey F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 3
4
In VesselIn Vessel Divertor Under evaluation: OMF-567: 3 rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015). Cassette body assembly: market survey mid- 2015. (target CFT Q1 2016) First Wall Awarded: [OPE-443] full scale prototype. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 4
5
Remote HandlingRemote Handling Awarded: Divertor RHS [OMF 340-1] to Assystem UK (rank 1) On-going: Cask & Plug RHS [OMF-577] CFEI published 3 rd June 2014. Deadline for requests to participate: 4 July 2014. Invitation to dialogue: expected October 2014. In-Vessel Viewing System [OMF-383] on-going dialogue since mid July 2014. Final invitation to submit tender: December 2014. Tender submission deadline: January 2015. Expected Award: July 2015. Under evaluation: Neutral Beam RHS [OMF 340-3] Tender phase ongoing, deadline for submission of tenders 16/06/2014. Expected Award: ExCo Jan. 2015. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 5
6
Cryoplant & Fuel cycleCryoplant & Fuel cycle Tritium Plant Under preparation: Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q3 2015. Vacuum pumping Awarded: OPE-551: He gas transfer lines. Signed on 04/09/2014 with Criotec Impianti. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 6 ITER Cryopump component
7
TBM & Materials developmentTBM & Materials development Ancillary system F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 7
8
Technical SupportTechnical Support F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 8
9
Planning and SchedulingPlanning and Scheduling Under evaluation: [OMF 555]: FW for dual use export compliance services [OMF 556]: FW for Planning and scheduling [OMF 557]: FW for Quality Inspection F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 9
10
Neutral Beam & EC Power SuppliesNeutral Beam & EC Power Supplies F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 10 1 MW CW Gyrotron (140 GHz) W7-X
11
Diagnostics F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 11
12
Buildings (and site adaptation) 1/2Buildings (and site adaptation) 1/2 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 12
13
Buildings (and site adaptation) 2/2Buildings (and site adaptation) 2/2 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 13
14
Antennas & Plasma EngineeringAntennas & Plasma Engineering EC launcher Antennas F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 14
15
F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 15 ILO Meeting #26 Market surveysILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF coils cold tests Market Surveys to come DIVERTOR – Cassette assembly, Q1 2015 EC UL/CODAC – System and Instrumentation Engineering Support, Q3 2014 Info Days to come 10 th June 2015: F4E Forum
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.