Figure 8.1. Engineering drawing of the “steer support”, a critical component of the Xootr scooter. The “height” of the steer support is specified by the.

Similar presentations


Presentation on theme: "Figure 8.1. Engineering drawing of the “steer support”, a critical component of the Xootr scooter. The “height” of the steer support is specified by the."— Presentation transcript:

1 Figure 8.1. Engineering drawing of the “steer support”, a critical component of the Xootr scooter. The “height” of the steer support is specified by the dimensions (shown in the lower center portion of the drawing) as falling between 79.900 and 80.000 mm.

2 Figure 8.2. Steer support within Xootr scooter assembly. The height of the steer support must closely match the opening in the lower handle.

3 Figure 8.3: Examples for variation types

4 Time periods Process Parameter Upper Control Limit (UCL) Lower Control Limit (LCL) Center Line Figure 8.4: A generic control chart

5 Figure 8.5: X-bar chart and R-chart

6

7 Figure 8.7: Comparison of three sigma and six sigma process capability 33 Upper Specification Limit (USL) Lower Specification Limit (LSL) X-3  A X-2  A X-1  A X X+1  A X+2  X+3  A X-6  B X X+6  B Process A (with st. dev  A ) Process B (with st. dev  B )

8 Browser error Number of defects Figure 8.8: Order entry mistakes at Xootr Order number out off sequence Product shipped, but credit card not billed Order entry mistake Product shipped to billing address Wrong model shipped 100 50 Cumulative percents of defects 100 75 50 25

9 Step 1Test 1Step 2Test 2Step 3Test 3 Rework Step 1Test 1Step 2Test 2Step 3Test 3 Figure 8.9: Two processes with rework

10 Step 1Step 2Step 3 Final Test Step 1Test 1Step 2Test 2Step 3Test 3 Figure 8.10: Process with scrap

11 Process Step Bottleneck Based on labor and material cost Market End of Process Defect detected Defect occurred Defect detected Cost of defect $ $ $ Based on sales price (incl. Margin) Recall, reputation, warranty costs Defect detected Figure 8.11.: Cost of a defect as a function of its detection location assuming a capacity constrained process

12 Figure 8.12.: Information turnaround time and its relationship with buffer size 7 1 2 3 4 5 6 8 ITAT=7*1 minute 3 1 2 4 ITAT=2*1 minute Good unit Defective unit

13 Kanban Direction of production flow upstreamdownstream Kanban Authorize production of next unit Figure 8.13.: Simplified mechanics of a Kanban system

14 Inventory in process Buffer argument: “Increase inventory” Toyota argument: “Decrease inventory” Figure 8.14.: More or less inventory? A simple metaphor

15 Figure 8.15.: Tension between flow rate and inventory levels / ITAT Flow Rate Inventory High Low High Inventory (Long ITAT) Low Inventory (short ITAT) Now Frontier reflecting current process Reduce inventory (blocking or starving become more likely) Increase inventory (smooth flow) New frontier Path advocated by Toyota production system


Download ppt "Figure 8.1. Engineering drawing of the “steer support”, a critical component of the Xootr scooter. The “height” of the steer support is specified by the."