Monthly Management Report May 2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
2
EXECUTIVE - SUMMARY 2 This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review 1. Scope and nature of services 2. Proposed manpower distribution. 3. Availability of manpower. 4. Major incidents summary. 5. Initiative taken. 6. Initiatives planned for next month. 7. Power failure analysis 8. Monthly HSD consumption. 9. DG- Generated power KWH. 10. EB power consumption. 11. Average power consumption EB+DG. 12. Liquid nitrogen consumption. 13. Suggestions and requirements. 14. Transition pending works. 15. Help desk, Complaint register
3
1.Scope & Nature of Services 3 CeNSE-Facility Management Electrical HVAC Plumbing Help desk ETP & Ultra Pure water system BMS
4
2.PROPOSED MANPOWER DISTRIBUTION 4
5
3.Availability of Manpower 5 DESIGNA TION Pl an ed Jul- 11 Aug- 11 Sep- 11 Oct- 11 Nov- 11 Dec- 11 Jan- 12 Feb- 12 Mar- 12 Apr- 12 Mar- 12 Facility Manager 111111111111 Technolog ist 333333333333 Electricia n 402334444444 Chiller operators 101111111111 BMS operator 301111111111 Plumbers100001111111 Asst.Tech nician 202222122222 Total1541011 131213
6
4.Major Incidents Summary 6 DateLocationDetailsFailure analysis 7-5-12 To 18-5-12 Characteriza tion LAB Precision A/C tripping problem solved with Vendor. Blower touching the body of the precision unit and got tripped continuously. 10-5-12 to 17-5-12 LT panel room Power fluctuation at LT panel room every 30 minutes. Due setting problem in main panel control system, it was tripping. Solved with the help of vendor. 26-5-12Clean room DI water leaked out and empty the DI water tank totally. DI water inlet to wet bunch aspirator was open position and drain valve not opened. 26-5-12UtilityPCW flow meter damaged. Actuator valve stem damaged. Due to pressure increased in the PCW system flow meter damaged.
7
5.Initiatives taken 7 1-5-12 –Old clean room Panels and tube lights dismantled. 8-5-12 – Diffusion room flow meter changed. 11-5-12 – Characterization lab precision A/C PPM done. 9-5-12 – SF-30 A/C drain line leakage problem solved. 14-5-12 – FF-10 Pedestrian fan repaired. 15-5-12 – Compressor shifted form Old clean room to utility building. 15-5-12 – TF -31 power socket alternation works done. 16-5-12 –SF-9,SF-10, FF-9 Light fittings fixed & panel board cleaned. 17-5-12 LT Panel room tripping problem solved with vendor. 18-5-12 – Characterization precision A/C tripping problem solved with Vendor. 18-5-12 – SF-10,Sf-11 Connection changed from raw power to UPS as requested by AN murthy. 19-5-12 – House vacuum PPM done. 20-5-12 – FF-10 Ceiling Fan fixed. 22-5-12 – Old clean room partition dismantling done. 23-5-12 – CeNSE building drinking water sensor problem solved. 24-5-12 – TF-11,21,10,12 UPS power provided as requested by Manjunath. 25-5-12 – SF-30 16 Amps socket fixed. 26-5-12 – Clean room DI water leakage due to improper operation of wet bunch aspirator and drain valve solved. 26-5-12 - Damaged PCW flow meter @ dry etch room replaced. 30-5-12 – SF-16,FF-03,TF-21 UPS connection provided as requested by Narahari. Characterization lighting problem solved out. 31-5-12 – TF-32 earthling problem solved.
8
6.Initiatives Planned for next month 8 Full fill of manpower. Training for maintenance staff. CeNSE building electrical room PPM. LT room PPM. CeNSE Building chilled water refilling & chiller repairing.
9
7.POWER FAILURE ANALYSIS 9 DATEFROMTOTOTAL 4-5-1216:10,18:3017:57,20:30, 227 Mins 8-5-1214:55,15:4015:20,16:2045 Mins 9-5-1214:32,16:15,16:10,16:30123 Mins 10-5-1210:55,11:40,12:40,13:30,11:20,12:05,13:10,14:10120 Mins 14-5-1210:25,11:10,12:15,13:10,14:50,10:55,11:45,12:50,14:35,15:00200 Mins 15-5-1212:20,14:35,15:5513:20,15:50,16:00140 Mins 17-5-1212:25,13:2013:00,16:00195 Mins 23-5-1219:00,19:2020 Mins 26-5-1213:1014:4090 Mins 29-5-1216:0016:4040 Mins TOTAL HRS20:00 Hrs
10
8.MONTHLY HSD CONSUMPTION 10
11
9.DG Generated Power KWH 11
12
10. EB Power Consumption 12
13
11.AVERAGE POWER CONSUMPTION EB+DG 13
14
12.LIQUID NITROGEN CONSUMPTION 14
15
13.Suggestions and Requirements 15 Shelters to be provided for DGs & Fire pump house to avoid rain water and leaves come inside the DG cabin & Raw water tank in side. Shelter with closed fencing can make on the Fire tank & this area use as storage place. PC with internet connection and telephone to be provided for maintenance team. Uniform & Safety shoes to be provided for all maintenance staffs. Walky-talky to provided for maintenance staff. CeNSE building – drawings and other documents to be handed over properly which is related with FM team. DG-3 (CeNSE Building) B-Check pending.
16
14.Transition – Pending works 16
17
15.Help desk, Complaints register 17
18
Thanks by, Facility Management Team 18