GOODWIN CREEK @ MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and riparian corridor functions (the Cadillac Plan)
2
THIS METHOD IS A RON REDMAN DISCOVERY (RRD)
3
1 2 3 4 5 6 7 8 9 10 11 12 Bend #1 Bend #2
4
Goodwin Creek @ McBride Property Design Layout for Bends 1 & 2 Tieback/key- 1.0 ton/ft LPSTP- 0.5 ton/ft LPSTP- 1.0 ton/ft KEY Traffic Control Stones Bendway Weirs 1.0 ton/ft Boil-Up Pool 2.0 tons/ft Bend 1 Bend 2 FLOW
5
BEND #1 WAS USED FOR THE LAST 10 YEARS TO DEVELOP THE ARS BANK STABILITY NUMERICAL MODEL
6
DESIGN CHOSEN BY THE LANDOWNER FOR BEND #1: LPSTP WITH BENDWAY WEIRS & MAXIMUM VEGETATION. BANK ALMOST COMPLETELY BUILT OUT INTO STREAM (UPPER BANK SLIGHTLY LAID BACK AT EDGE)
7
Bend #1, Looking DS
8
Pix with outline of proposed work FILL CUT LPSTP Typical post-project cross-section
9
Goodwin Creek-Cross Section-Soil Cut/Fill Area (Bend 1) NOTE: All cut/fill activity will be in balance KEY LPSTP Fill area ELE +0.0 +12 +15 Varies 7 to 14 ft Cut areas This left bank cut area will also provide a floodplain bench for the stream 6 ft LPSTP Top bank, right descending bank
10
Project designers Dr. Andrew Simon ARS-NSL & Dave Derrick, ERDC-CHL GOODWIN CREEK–CONSTRUCTION-FEB 2007–DIRK SPENCER
11
THE PLAN Actually Derrick’s cheat sheet PIX BY DANNY KLIMETZ
12
TREE & GRASS SEEDING & MULCHING BEND #1
13
Ron Redman says break up the Sycamore tree seed balls & add them to the hydroseed mix
14
Or slap a Sycamore with the trackhoe & release a thousand seeds GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK
15
Sycamore seeds everywhere - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK
16
Redman’s trees seeds spread on ground - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN
17
We talked the Pennington sales rep out of 4 bags of “Pennington SLOPEMASTER Mix” grass seed. This seed worked well in our application. Extreme upper bank was not as lush or robust as other areas. Possibly a lack of moisture issue? GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ
18
Seeding “Pennington Slope Master Mix” grass seed - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ
19
Hay bales for mulch - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN
20
Rolling and spreading hay - BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN
21
Mulch the bank, this section is done - BEND #1 GOODWIN CREEK–CONSTRUCTION-FEB 28, 2007–DANNY KLIMETZ
22
Looking DS at mid & lower end of BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 –SHARLA LOVERN
23
Looking DS @ the crew - BEND #1 – 99% DONE GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK
24
Bend #1 DONE! Looking US & panning clockwise
25
Looking US BEND #1 GOODWIN CREEK – CONSTRUCTION - FEB 2007 -DERRICK
26
This PowerPoint presentation was developed & built by Dave Derrick. Any questions or comments, call my personal cell @ 601-218-7717, or email @ d_derrick@r2d-eng.com Enjoy the information!! d_derrick@r2d-eng.com
27
The Bassett as a mountain lion