Download presentation
Presentation is loading. Please wait.
Published byChad Elmer Lambert Modified over 9 years ago
1
Team legado 1. Amer Al Mazrouei 2. Mohammed Sharara
2
1. Purpose and Goal of the project 2. Objectives tree 3. W.B.D tree (work break down tree) 4. Deliverables, timelines and responsibilities 5. D.R.S (data retrieval system) 6. Budget
3
Conceive a design for a playground for children with special needs. The design should be: 1. Safe 2. Affordable 3. reliable
4
Design of the playground Safe Affordable Reliable Materials Location Surface Equipments Skills developing Educational Mental skills Physical skills Materials Maintenance Cost
5
Design a Playground for children with special needs (W.B.D tree) Clients problem Establish function requirements Establish alternatives Testing Selecting design Revise the problem Carry out research Develop objective tree Brainstorm Consider means to be used Establish functions Develop charts Establish conceptual design Pair wise comparison Protocol testing Apply the design Review with client Final design selection
6
Each team member’s responsibility is presented in L.R.C Deadlines of deliverables are presented in a calendar
7
Linear Responsibility ChartMohamad AbdullaFahad Altamim Mohamed Sharara Amer AlmazroueiClient Liaison 1.0 Understand the client`s requirements x xxx 1.1 Clarify problem Statement xo 1.2 Conduct Researches x x 1.3 Develop objective tree xx 1.3.1 Draft objective tree x x 1.3.2 Review objective tree x o 2.0 Analyze function requirements xxx x 3.0 Generate alternatives xxxx 4.0 Evaluate alternatives x o 4.1 Weight objective ox 4.2 Develop test protocols x x 4.3 Conduct tests xo 4.4 Report test results xo 5.0 Select preferred design xxx xx 6.0 Document design results xx 6.1 Design specification x x o 6.2 Draft final report xx x x 6.3 Design review with client x x 6.4 Final report xxx x 7.0 Project management x 7.1 Weekly meetings xx x x 7.2 Develop project plan xxx x 7.3 Track progress xx x Key: x = Responsibility o = Support
8
Team Legado’s D.R.S will be a website used for: ◦ Keeping track of progress ◦ The ability to access files outside work place ◦ Share files between team members
9
Team members Hours/dayHours/weekpayment/hour (AED) Total (AED) Mohamad Abdallah 2.512.54005000 Fahad Al Tamimi 2104004000 Mohammed Sharara 2104004000 Amer Al Mazrouei 2104004000 The salary includes Transportation Telecommunication Materials Miscellaneous
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.