Download presentation
Presentation is loading. Please wait.
Published byGabriel Riley Modified over 10 years ago
1
International Telecommunication Union September 2010 WRC-12 PREPARATIONS MID Regional Planning Seminar 19/20 September 2010 W. Frank Radiocommunication Bureau International Telecommunication Union
2
September 2010 ~ 2.5 years of studies Timetable towards WRC-12 Situation as of today
3
International Telecommunication Union September 2010 WP 1A WP 4A 1.2 1.13 1.6 1.19 WRC-12 (agenda items) CPM11-2 CPM Management Team Meeting Draft CPM Report 1.22 WP 1B WP 4C 1.71.18 WP 5A 1.23 1.25 WP 5B 1.31.41.91.10 1.141.151.21 WP 5C 1.51.81.20 WP 7B 1.111.121.24 WP 7C 1.16 JTG 5-6 1.17 SC 7 Technical aspects Regulatory and procedural aspects WP 1A 8.1 sub-issues Chapter 1 (draft texts) Chapter 2 (draft texts) Chapter 3 (draft texts) Chapter 4 (draft texts) Chapter 5 (draft texts) Chapter 6* (draft texts) * includes also a.i. 2, 4, 8.2 CPM Report to WRC-12 SC Responsible ITU-R Groups WP 4ASG 7 Resp. Groups vs Agenda items
4
International Telecommunication Union September 2010 1.1.Maritime and Aeronautical issues 2.2.Radiolocation and Amateur issues 3.3.Fixed, Mobile and Broadcasting issues 4.4.Science issues 5.5.Satellite issues 6.6.Future work programme and other issues CPM Report – Table of contents Chapters of CPM ReportWRC-12 Agenda items 1.2, 1.19, 2, 4, 8.1, 8.2 1.3, 1.4, 1.9, 1.10 1.14, 1.15, 1.21, 1.23 1.5, 1.8, 1.17, 1.20, 1.22 1.6, 1.11, 1.12, 1.16, 1.24 1.7, 1.13, 1.18, 1.25, 7
5
September 2010 5 The next steps 2010-11-01 to 2010-11-05 Special Committee – regulatory/procedural matters 2010-11-24 to 2010-11-25 Information Meeting on WRC-12 Preparation 2011-02-14 to 2011-02-25 Second Session of the Conference Preparatory Meeting for WRC-12 Deadlines for CPM contributions: 14 November 2010 – in 6 languages 31 January 2011 – in original language
6
September 2010
8
8
10
http://www.itu.int/ITU-R/go/rcpm
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.