Presentation is loading. Please wait.

Presentation is loading. Please wait.

ACARS & VDL Mode AVICOM Japan

Similar presentations


Presentation on theme: "ACARS & VDL Mode AVICOM Japan"— Presentation transcript:

1 ACARS & VDL Mode 2/AOA @ AVICOM Japan
Initial Operating Conditions      & Experience         @ AVICOM Japan S. Matsuzaki Director Engineering

2 AVICOM Japan ACARS Service deployed APR. 1990
AOC Interoperability was established   between SITA (1990) and ARINC (1991) Connected to KDD Yamaguchi GES for SATCOM Data service (1990) Head Office. Minato-ku, Tokyo Capital. 1,310 Million Yen Stockholders JAL, ANA, JAS, NTT, KDDI, NTT data etc

3 ACARS Current Status as of Oct. 2003
49 ACARS RGS in operation now. Base Frequency = MHz 2nd Frequency = MHz                at 7 Major airport Approx. 2.2 Million Blocks / month Up link success rate : Approx. 92 %

4 ACARS Traffic trend Blocks

5 Success rate history Uplink success

6 Driving factor toward VDL AOA
Steady growth of data link traffic Need faster & reliable means to avoid capacity constraint. VDL AOA (ACARS Over AVLC) 1st step for AOC delivery improvement ATN (VDL M2) as 2nd step for ATS

7 VDL/AOA implementation
Contract with Mar. 2002 IOC : September       at Narita & Kansai A/P. 10 airports were selected as VDL/AOA site at initial phase.

8 ACARS and VDL/AOA Architecture at AVICOM Japan
RGS ACARS ARINC SITA Airline AVICOM Center Existing ACARS System JDLC VGS NMS Gate Way AGRM VDL Mode-2/AOA System

9 VDL System components NMS Gateway AGRM

10 RGS VGS ACARS Remote Ground Station VDL Ground Station

11 Performance - VDL Initial two weeks experience after IOC.
Two aircraft, B ER have logged on to VGS. The airplane has flown Kansai – China (Beijing, Shanghai) Kansai – Haneda Up link success = 98 % @ Gateway per message block

12 Difficulties - VDL VDL range seems slightly smaller than that of ACARS
VDL cloud seems not continuous between Narita and Kansai. Need more VGSs to cover whole airspace over Japan. Blind area at Kansai airport Installation of one more VGS at the other side of the terminal

13 Planned VGS deployment 2nd phase 1st phase CTS KUH KIJ IZO SDJ FUK NRT
HND KOJ NGO KIX KCZ OKA

14 Emerging ATN VDL/AOA Sys can be upgraded to an ATN compliant system by adding; Software to handle ATN message Routers for distribution of ATN message And some others. (Hard & Soft) Time for the upgrade depend on the progress of ATN implementation in Japan and World wide.

15 GEO Thank you ! AOA N/W ACARS N/W TOKYO ACC ARINC SITA AIRLINES HOST


Download ppt "ACARS & VDL Mode AVICOM Japan"

Similar presentations


Ads by Google