MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI
2
Overview MT Continuum overview AIM toolset role Issues and concerns Process flow
3
MT Continuum Prototype Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE- conformant Instructor Led (ILT) and self-paced segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms MT Continuum team: –SSP / contractors - Requirements Owners –NAWCTSD / AIM team - CPM/LO Module support –LSI, Inc. - ISD and self-paced content design/development
4
AIM Tool Usage Dedicated MT Continuum Prototype CPM and AIM I Rel 4.0 instances hosted in Orlando Local AIM I Rel 4.0 instances running at GD-AIS Pittsfield (SMEs) and at LSI Jax (ISD/CD) Significant progress made to date on bi-directional data exchange between LO Module and LSI Venus.net LDC authoring toolset Excellent feedback from MT Continuum team on enhanced functionality and performance needed in CPM & LO Module
5
AIM Tool Usage (contd) Status: –Per GD-AIS feedback, performance-enhanced version of AIM I Rel 4.0 running locally in Pittsfield and Jax as well as on Orlando server –Per GD-AIS feedback, significant enhancements made to AIM I Rel 4.0 storyboard functions/output –Several additional enhancements recommended by GD-AIS being analyzed by AIM team for incorporation into AIM I Rel 5.0 (Jul 10 delivery) –AIM team continues troubleshooting performance and reliability issues with Orlando AIM I Rel 4.0 instance
6
Issues/Concerns “End to end” surveillance/maintenance test on TLO/ELO occurred to: –confirm existing change impact identification functionality in CPM and LO Module –identify near-term updates –refine longer-term enhancements Test conducted by Mark Campbell and Mike Lueken w/ favorable results & identified critical issues to be addressed before full-rate production
7
7 Modernized AIM Modernized AIM can tie the entire process together Modernized AIM can tie the entire process together
8
MT Continuum Process 8
9
Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development Closely coordinated with NAVEDTRA 136 development (Mark Campbell & Jamie Stewart involved in project) Potential “Poster Child” for ongoing NETC Continuum effort with all Centers Integrated development and maintenance environment for blended, SCORM and 136-compliant learning content
10
FRM Inputs on Enhancements To be covered this afternoon during AIM/CPM Demo