Download presentation
Presentation is loading. Please wait.
Published byLaureen Higgins Modified over 9 years ago
1
Performance Based Navigation Aviation Industry Forum 18 November 2009
2
Introduction to PBN Changes to Air Navigation Planned Implementation 18 November 2009 PBN Industry Forum
3
Air Traffic Enabling 18 November 2009 PBN Industry Forum Operations Airspace Management Flow Management Traffic Management Trajectory Management Environment RCPPBNRSPWeatherWorld System Status ACARS VDL 2 VDL 3 Mode S etc RNP AR RNAV Enroute SID STAR APV GNSS ADS B MLAT P & SSR TCAS ASDE TAWS EFB HUD NZMet SATMet PIREP Air Traffic Enabling Applications FE CAM App Seq Opt FMS RTA upgrades Datalinked wind MTCD Prioritisation AIS Collaboration Functions
4
More Precise Navigation (RNAV / RNP) More Predictability of Flight Paths More Efficiency for each flight More Efficiency for Air Transport System 18 November 2009PBN Industry Forum PBN Changes Air Navigation
5
Reference Business Trajectory (RBT) RBT authorised by the ANSP, executed by the flight crew unless there is intervention for the purpose of separation provision or other safety related needs. Page : 17 [MJ1] Takes account of comments 56, 60. Page : 17 [MJ2] Takes account of comments 64 CTA AUTHORIZED RBT EXECUTED RBT CURRENT POSITION AGREED RBT Continuous Descent Approach “The unique 4D description of the trajectory” PBN Industry Forum 18 November 2009
6
RNAV Arrivals – Auckland 18 November 2009 PBN Industry Forum
7
Planned Implementation Harmonised with ICAO Global & Regional Plans Phased Introduction for NZ Aviation Industry Civil Aviation AC & Rule Changes Needed GNSS is Key Enabler 18 November 2009PBN Industry Forum
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.