Download presentation
Presentation is loading. Please wait.
Published byJoanna Jackson Modified over 9 years ago
1
Time Series for the east end of Raccoon Island of the Isles Dernieres 1984 - 2007 Aerial Video Survey Program Pontchartrain Institute of Environmental Sciences University of New Orleans Karen A Westphal
2
The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison. The Aerial Video Survey Program has been acquiring photography and video of the northern Gulf of Mexico shoreline since 1984. Oblique aerial photography does not produce exact matches due to variations in altitude, camera angle and distance from the shore (and different photographers). Photos that matched well were scaled and aligned to illustrate the landscape changes that have taken place between time periods. Occasionally a pointer or symbol was added to assist with the visual comparison.
3
Location of Raccoon Island, Louisiana The east end of Raccoon Island is in BICM region “Teche Delta” and BICM segment 33 “Raccoon Island”
4
1985 - post-Hurricane Juan 29º02’49”W - 90º54’51”N View to the west
5
1986 29º02’49”W - 90º54’51”N View to the west
6
1987 29º02’49”W - 90º54’51”N View to the west
7
1988 29º02’49”W - 90º54’51”N View to the west
8
1991 29º02’49”W - 90º54’51”N View to the west
9
1992 pre-Hurricane Andrew 29º02’49”W - 90º54’51”N View to the west
10
1992 post-Hurricane Andrew 29º02’49”W - 90º54’51”N View to the west
11
1993 29º02’49”W - 90º54’51”N View to the west
12
1994 post FEMA restoration 29º02’49”W - 90º54’51”N View to the west
13
1996 29º02’49”W - 90º54’51”N View to the west
14
1999 - 2yrs post breakwater 29º02’49”W - 90º54’51”N View to the west
15
2001 29º02’49”W - 90º54’51”N View to the west
16
2002 post-Hurricane Lili 29º02’49”W - 90º54’51”N View to the west
17
2004 post-Hurricane Ivan 29º02’49”W - 90º54’51”N View to the west
18
2005 post-Hurricane Katrina/Rita 29º02’49”W - 90º54’51”N View to the west
19
2007 - February post CWPPRA TE-48 breakwater installation 29º02’49”W - 90º54’33”N View to the west (~303º)
20
2007 - April 29º02’45”W - 90º54’36”N View to the northwest (~310º)
21
11 Years 1996 1985
22
3 Years post breakwaters 1999 - 2 yrs post TE-29 1996 - 1yr pre TE-29
23
11 Years 1996 2007
24
22 Years 1985 2007
25
Relevant Coastal Restoration Projects Raccoon Island Repair. State Project Number: RI Project Priority List (PPL): N/A Project Type: Beneficial Use of Dredged Material Construction Completion Date 1994 Description: This project was a cooperative effort that utilized dredged material and vegetation to repair Raccoon Island from storm damage. Cooperators include the Louisiana Department of Natural Resources (LDNR)/ Coastal Restoration Division (CRD), Louisiana Department of Wildlife and Fisheries (LDWF)/Fur and Refuge Division, Terrebonne Parish Consolidated Government (TPCG), South Terrebonne Tidewater Management and Conservation District, T. Baker Smith & Son, Inc., Coastal Engineering & Environmental Consultants, Inc., and Bean Dredging. Federal grant money was also utilized for this project by LDWF and TPCG. Raccoon Island Breakwaters Demonstration. State Project Number TE-29 Project Priority List (PPL): 05 Federal Sponsor: Natural Resources Conservation Service (NRCS) Project Type: Barrier Island Construction Completion Date 1997 Description: This demonstration project's goal is to reduce shoreline erosion and increase land coverage. Eight segmented breakwaters were constructed along the eastern end of the island to reduce the rate of shoreline retreat, promote sediment deposition along the beach, and protect seabird habitat. Project effectiveness was determined by monitoring changes in the shoreline, wave energy, and elevations along the beach, and by surveys of the gulf floor between the shoreline and the breakwaters. Raccoon Island Shoreline Protection/Marsh Creation. State Project Number TE-48 Project Priority List (PPL): 11 Federal Sponsor: Natural Resources Conservation Service (NRCS) Project Types: Shoreline Protection, Marsh Creation Construction Completion Date Pending Description: The goal of this project is to protect the Raccoon Island rookery and seabird colonies from an encroaching shoreline by reducing the rate of erosion along the western end of the island and creating more land along the northern shoreline. This goal will be accomplished through the construction of eight additional segmented breakwaters and a terminal groin along the gulf side of the island, adjacent to the Raccoon Island Breakwaters Demonstration (TE-29) project. In addition, dredged material will be used to create marsh on the bay side of the island. http://dnr.louisiana.gov/crm/coastres/projectlist.asp Raccoon Island Repair. State Project Number: RI Project Priority List (PPL): N/A Project Type: Beneficial Use of Dredged Material Construction Completion Date 1994 Description: This project was a cooperative effort that utilized dredged material and vegetation to repair Raccoon Island from storm damage. Cooperators include the Louisiana Department of Natural Resources (LDNR)/ Coastal Restoration Division (CRD), Louisiana Department of Wildlife and Fisheries (LDWF)/Fur and Refuge Division, Terrebonne Parish Consolidated Government (TPCG), South Terrebonne Tidewater Management and Conservation District, T. Baker Smith & Son, Inc., Coastal Engineering & Environmental Consultants, Inc., and Bean Dredging. Federal grant money was also utilized for this project by LDWF and TPCG. Raccoon Island Breakwaters Demonstration. State Project Number TE-29 Project Priority List (PPL): 05 Federal Sponsor: Natural Resources Conservation Service (NRCS) Project Type: Barrier Island Construction Completion Date 1997 Description: This demonstration project's goal is to reduce shoreline erosion and increase land coverage. Eight segmented breakwaters were constructed along the eastern end of the island to reduce the rate of shoreline retreat, promote sediment deposition along the beach, and protect seabird habitat. Project effectiveness was determined by monitoring changes in the shoreline, wave energy, and elevations along the beach, and by surveys of the gulf floor between the shoreline and the breakwaters. Raccoon Island Shoreline Protection/Marsh Creation. State Project Number TE-48 Project Priority List (PPL): 11 Federal Sponsor: Natural Resources Conservation Service (NRCS) Project Types: Shoreline Protection, Marsh Creation Construction Completion Date Pending Description: The goal of this project is to protect the Raccoon Island rookery and seabird colonies from an encroaching shoreline by reducing the rate of erosion along the western end of the island and creating more land along the northern shoreline. This goal will be accomplished through the construction of eight additional segmented breakwaters and a terminal groin along the gulf side of the island, adjacent to the Raccoon Island Breakwaters Demonstration (TE-29) project. In addition, dredged material will be used to create marsh on the bay side of the island. http://dnr.louisiana.gov/crm/coastres/projectlist.asp
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.