1 Total Airport Management CARE Innovative Study
Institute of Flight Guidance Dr.-Ing. Henning Hartmann

2 Outline DLR Institute of Flight Guidance Background of TAM
Context and Complexity of TAM Future Steps Henning Hartmann – EUROCONTROL CARE Study

3 31 research institutes and scientific/technical facilities at 8 sites
4 branches German-Dutch Wind Tunnel (DNW) European Transonic Wind Tunnel (ETW) Henning Hartmann – EUROCONTROL CARE Study Institute of Flight Guidance, Braunschweig

4 Capacity Development Plans
Air Transportation Fast Time Simulations 3 Ideas Capacity Development Plans Today‘s Capacity Improved Capacity Delay 8 4 Increase of Traffic Flow Analytical Models 7 8 9 4 5 6 1 2 3 = + x : - CE/C Off CM RM M- % M+ Henning Hartmann – EUROCONTROL CARE Study Decrease of Average Delay Flow

5 Human Factors Human / Machine Cooperation Methods and Consulting
Evaluation and Validation Exercises Henning Hartmann – EUROCONTROL CARE Study

6 Controller Assistance
Concepts & Systems Runway Operations Management DARTS 4D Planner Arrival Management Departure Management TARMAC Ground Movement Management Henning Hartmann – EUROCONTROL CARE Study Airport and Airline Management

7 Information Management
Operations Control Information Management in Systems of Systems Total Airport Management A-SMGCS Henning Hartmann – EUROCONTROL CARE Study BETA

8 Your Timeline to New Air Traffic Management Concepts, Tools, and Services
Departure/Arrival Management Implementation Requirements Analysis Master Plan Implementation Preparation Validation Air-Ground Integration A-SMGCS Evaluation Environment Airport Management Henning Hartmann – EUROCONTROL CARE Study Application Areas

9 Turn-around-Cycle CFMU Sector Apron Stand TMA RWY Taxi Outbound
Henning Hartmann – EUROCONTROL CARE Study Inbound ACC APP TWR AOC Apron

10 Punctuality depends on
the expected capacity during main planning phase the impact and severity of effects if systems capacity degrades the awareness of the degradation-effects to capacity the existence of contingency plans the available reaction time the degree of redundancy the ability to implement plans Henning Hartmann – EUROCONTROL CARE Study

11 Phases of Flight Cruise Climb Descend Air Traffic Management Taxi Fly
Taxi & Ramp Management Taxi Taxi Taxi Taxi Taxi Taxi Henning Hartmann – EUROCONTROL CARE Study Stand & Gate Management Dispatch Dispatch

12 Basic Management Areas
Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound

13 Producer – Consumer Relations
ATOT AOBT ATOT CTA CTOT EOBT Outbound Air Traffic Management Taxi & Ramp Management Gate & Stand Management Henning Hartmann – EUROCONTROL CARE Study AIBT Inbound ETO ETA EIBT

14 Planning Intervals and Horizons
Outbound Henning Hartmann – EUROCONTROL CARE Study Inbound

15 Focus of first Step Outbound Inbound
Henning Hartmann – EUROCONTROL CARE Study Inbound

16 Monitors along Turn-around-Cycle
Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound 1. 2.

17 Concepts-of-Concepts for the Macroscopic View
Meta Management Concept Meta Management Concept Air Traffic Management Concept Taxi & Ramp Management Concept Stand & Gate Management Concept Henning Hartmann – EUROCONTROL CARE Study

18 Macroscopic View Management Layer (MVML)
MVML is an enabler for Global access to flight estimates Global access to flight plans and “ground plans” Global A/C flight/ground status and key-event tracking Global A/C planning status tracking Henning Hartmann – EUROCONTROL CARE Study

19 expected Benefits of a MVML
Common sense and common awareness of planned vs. current flow Maximum coordinated traffic flow Optimum use of resources (Airspace, RWY, Taxiway, Stand/Gate) Predictability (Depth of focus concerning planning intervals) Stability of Operations req.s (looking up) Stability of Plans req.s (looking down) Punctuality minimised domino effects beyond the own area of responsibility harmonised, seamless transition on all planning intervals Henning Hartmann – EUROCONTROL CARE Study

20 MVML features comprehensive information flow optimal use of capacity
no overload of the operators automatic coordination clear definition of the responsibilities common performance specification modular and upgradeable Henning Hartmann – EUROCONTROL CARE Study

21 Challenges of integration / optimisation
the different orientations and philosophies of the stakeholders the complexity and diversity of the overall system and the dynamism of the current operation in conjunction with the integration of multi-phased planning intervals different time horizons a real-time operation evaluation is quite difficult for each operation centre especially because of the non-existence of common evaluation metrics an insufficient / non-existent synchronisation of planning intervals and cycle lots of “ad hoc planning” operation centres at the airport site Henning Hartmann – EUROCONTROL CARE Study

22 Air Traffic Management
Monitor Example Outbound Air Traffic Management Taxi & Ramp Management Stand & Gate Management Henning Hartmann – EUROCONTROL CARE Study Inbound 1. 2.

23 Flow Monitor DLR is developing measurement devices and analyses the results in order to evaluate modified procedures, new implemented management tools, the traffic situation Henning Hartmann – EUROCONTROL CARE Study

24 Henning Hartmann – EUROCONTROL CARE Study

25 The Consortium Henning Hartmann – EUROCONTROL CARE Study

26 Work Breakdown Structure
Henning Hartmann – EUROCONTROL CARE Study

27 Time Schedule Henning Hartmann – EUROCONTROL CARE Study

28 henning.hartmann@dlr.de x.49.531.295.2525
Henning Hartmann – EUROCONTROL CARE Study

29 DLR site at Braunschweig
Henning Hartmann – EUROCONTROL CARE Study DLR site at Braunschweig

30 Reality Simulation edc March 2003
Henning Hartmann – EUROCONTROL CARE Study edc March 2003

31 Simulation Complex National Simulation Cooperation ATTAS
Experimental Cockpit Cockpit Simulator Apron & Tower Simulator ATMOS Henning Hartmann – EUROCONTROL CARE Study National Simulation Cooperation

32 Institute of Flight Guidance
Henning Hartmann – EUROCONTROL CARE Study

33 BETA Validation Acceptance Test and Evaluation
is an example for the operational benefit validation of an A-SMGCS performed by DLR together with 13 European partners. Henning Hartmann – EUROCONTROL CARE Study

34 A-SMGCS Validation Acceptance Test and Evaluation
FIELD TESTING and REALTIME SIMULATIONS are used to analyse the technical performance, the operational benefit and different solutions in comparison of ATM procedures, tools and systems. Henning Hartmann – EUROCONTROL CARE Study