Download presentation
Presentation is loading. Please wait.
1
ETFMS - SYSTEM OVERVIEW
Meteo Interface FP-1 (Haren) ETFMS Central Server (ETFMS-CS) AN-1 ENV Local Terminals Remote FP-2 (Brétigny) AFTN CIDIN Wide Area Network (s) T AN-3 NM (CFMU) ACC R Entry Nodes ATM systems SDPS FDPS
2
ETFMS - ARCHITECTURE
3
ETFMS - ARCHITECTURE Haren WAN Brétigny ATS ATS ATS AN3 CS EN-A EN-B
Router ECMC Others CS ATS EN-A EN-B Router Correlated Position Data Flight data (FSA) ATS EN-A EN-B Router Correlated Position Data Flight data (FSA) WAN Brétigny ECMC Router AN3 Others CS ATS EN-A EN-B Router Correlated Position Data Flight data (FSA)
4
ETFMS - INSTALLED SITES
Planned 2012 Pending
5
ETFMS - EN Physical view
6
EN - Data Functions (1) Data Collection Data Forwarding
Interface to various ATS configurations at different sites Receive Position Data (tracks) and Flight Plan Data Data Forwarding Connection Management, Frame Assembly Data Replication to several recipients
7
EN - Data Functions (2) Data Processing
Convert data to common representation (ASTERIX CAT062) Transform Coordinates into WGS84 Maintain Track and Flight Plan Database User Controlled Data Reduction Update Tracks and Flight Plan data Id fields
8
ETFMS - Data Items (1) Mandatory Data Items
Aircraft Identification (callsign) Flight Level Aircraft Position ADEP / ADES EOBT (*) Mode 3/A SSR Code (*) Highly desirable
9
ETFMS - Data Items (2) Optional Data Items IFPS_Flight_ID
24bit ICAO Aircraft address Track Status Aircraft Velocity Rate of Climb and Descent Rate of Turn
10
ETFMS - Interfaces (1) Supported Input Data Formats
ASTERIX CAT062 (v0.17 or v1.3) FSA (*) (*) Needed in case flight data items (e.g. ADEP, ADES, EOBT, IFPLID) are not present in the position data stream and/or to filter out VFR and OAT traffic.
11
ETFMS - Interfaces (2) Supported Connection Types TCP (¹) UDP (¹) X25
HDLC Datagram ‘RMCDE’ ‘ARTAS’ AFTN - Async (²) (¹) Preferred (²) In case FSA messages are needed
12
ETFMS - PROCESS (1) Agreement on the technical interfaces between EN and ATC system - ICD Signature of Letter of Agreements (LoA), related to Data provision Equipment (ownership, installation, etc) Financial conditions
13
ETFMS - PROCESS (2) Adaptations, if any, in ATC systems
Purchase and installation by NM (CFMU) of EN Validation of received data (CPRs) in NMOC (CFMU) test system Move of received data (CPRs) to NMOC (CFMU) operational system FAM activation (after agreement with ANSP)
14
CPR Operational Evaluation
ETFMS - PROCESS (3) CPR Operational Evaluation Provide live data to ETFMS Shadow/test system. NMOC (CFMU) Evaluates and provides evaluation report to ANSP. Improvements may be required. Go-No-Go decision. Agree date to send CPRs to ETFMS Operational system.
15
ETFMS - PROCESS (4) Costs NM (CFMU) provides Entry Node.
NM (CFMU) provides network connection. NMOC (CFMU) Operates Entry Node. ANSP is requested to: Supply space for EN rack in the computer room Supply power for the EN Adapt software of its ATC systems if required
16
Your questions are very welcome
17
Thank you for your attention
Michel Wuestenberghs
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.