Presentation is loading. Please wait.

Presentation is loading. Please wait.

28 May 2013 AIM Global context ADQ Workshop

Similar presentations


Presentation on theme: "28 May 2013 AIM Global context ADQ Workshop"— Presentation transcript:

1 28 May 2013 AIM Global context ADQ Workshop
Paul Bosman Manager SWIM/EA Unit, Agency focal point AIM. EUROCONTROL Chairman ICAO AIS-AIMSG

2 AIS-AIM Study Group Active since end 2008 Objectives Participants
28/03/2017 AIS-AIM Study Group Active since end 2008 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance for a standard AICM/AIXM to enable global digital data exchange Other material required to support AIM implementation Participants *ANSPs/CANSO, IATA/3rd party data providers, IFALPA, IFAIMA, ICAO Secretariat, Regulators, EUROCONTROL *Participants as experts not as organisation’s representative Enter here your Presentation Title

3 AIM implementation in EUR West region

4 Contribution of ADQ to AIS2AIM
AIM implementation in EUR West region

5 ADQ relevant changes in Amdt 36 Applicability date 2010

6 Some ADQ relevant Anx 15 – Amdt 37 changes – I Applicability date November 2013

7 Some ADQ relevant Anx 15 – Amdt 37 changes - II

8 Some ADQ relevant Anx 15 – Amdt 37 changes - III
UML, Temporality, Extension mechanism, ..

9 Some ADQ relevant Anx 15 – Amdt 37 changes - IV

10 ICAO Guidance Guidance material (Available Q4-2013/..)
Update AIS Manual (Doc 8126) Amdt 3 New Quality Manual (Doc 9839) New Training Manual (Doc 9991) Update of Charting Manual (Doc 8697) Update of eTOD/AMDB Guidance (Doc 9881) Update of WGS84 Manual (Doc 9674) Update of Public Usage of Internet (Doc 9855)

11 Further plans Anx15 - Amdt 38/… – (planned appl date Nov 2016/…)
Data users vs Product users Ch4 Data & Information scope Unambiguous description of all data required Ch5 Temporality and Distribution More flexible AIRAC cycle / NOTAM 21st Century Ch6 Services Products – Datasets, AIP/Rulebook, Charts Data Services – Core & Customised All ‘formatting’ into a new PANS-AIM document PANS-AIM

12 Amdt 38 : A possible Services set-up
28/03/2017 Amdt 38 : A possible Services set-up States shall provide - AIP, AIP amendments, AIC and SUP - Aeronautical charts (see Anx 4) - NOTAMs/SNOWTAMs/ASHTAMs/Summs/Chcklists - PIBs States should provide Electronic Aeronautical charts (see Anx 4) eAIP Examples - Airspace data above a certain FL Prohibited, Restricted and Dangerous areas within a timeslot - Procedures for a given navaid ANNEX 15 SCOPE SERVICE 1 Provision of aeronautical information in a standardized pre-defined presentation SERVICE 2 Provision of digital data services SERVICE 3 Value-added service with customized presentation of aeronautical information and data - Complete data set (as defined in Chapter 4) - Thematic baseline data: - AIP data set - eTOD - AMDB - Instr Flight Proc Design - Other (TBD) Update service (Cont/Cyclic) if operationally significant Data filtering Temporal aspects / validity Geographic al, time window, data features,… Format (and structure) Accessibility - Request/reply vs Publish/subscribe Metadata - CD, Internet, SWIM Numerical requirements Enter here your Presentation Title

13 Amdt38 : Anx 15/PANS-AIM/Doc8126
State provisions (or « what ») Some initial tests: AIP Chapter Anx 15 : +- 2/3 of current Ch4  PANS-AIM Doc8126: %  PANS-AIM eTOD More tricky Need to differentiate between data collection aspects and output data sets Unlike aerodrome data, there is no companion DQR for data acquisition in other Annexes (4 and 11) +- 50% stays in Annex 15, 50% go to PANS-AIM Amdt 38/… Operational provisions (or « how to ») PANS-AIM Explanatory text

14 ICAO Air Navigation Conference 19 – 30 Nov
>1200 people from >170 delegations

15 ICAO Air Navigation Conference AIM Conclusions in a nutshell
ICAO to Expedite AIM SARPS and Guidance Review NOTAM system - building from Digital NOTAM States To accelerate AIS2AIM transition (via digital data-chain) Encouraged to impl quality processes from data origin onwards Encouraged to impl (sub-)regional Db & digital data exchange Review NOTAM proc, guidance & oversight Industry To provide AIM systems 15

16 Some words on AIXM5.1 Many maturing implementations
A stepping stone towards Global Interoperable ATM Need for further guidance: Business Rules, Metadata, …

17 Conclusion ICAO AIM developments in full motion
EU 73/2010 ICAO AIM developments in full motion Anx 15 – ADQ : Two sides of the same coin I.e. ADQ very much Eur impl of AIS2AIM Roadmap >= Amdt 38 ADQ update for Anx 15 desirable To be clarified : EASA Anx 15 transposition See > Meetings


Download ppt "28 May 2013 AIM Global context ADQ Workshop"

Similar presentations


Ads by Google