Moving Towards an Integrated ASM/ATFCM/ATS Approach

Similar presentations


Presentation on theme: "Moving Towards an Integrated ASM/ATFCM/ATS Approach"— Presentation transcript:

1 Moving Towards an Integrated ASM/ATFCM/ATS Approach
ADR Developments 20-21 Sep 2012 Nil AGACDIKEN ADR Programme Manager

2 Official vs. Operational Data
Annex 15 Operations

3 Access interface (B2B –B2C)
ADR Data Processing Output Data Provision D > 1 week Access interface (B2B –B2C) Interface (B2B –B2C) RAD AIP e-RAD Static AIRAC data NOTAM NOTAM/ RAD AIP + e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP

4 Access interface (B2B –B2C)
ADR Data Processing D > 1 day Output Data Provision D > 1 week Access interface (B2B –B2C) Traffic restrictions e-ASM AIXM 5.1extensions e-RAD AIXM AUP UUP e-AMI ANSP AMC e-RAD Upd. EAUP e-AMI Interface (B2B –B2C) RAD AIP e-RAD Static AIRAC data NOTAM NOTAM/ RAD AIP + e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP

5 Access interface (B2B –B2C)
ADR Data Processing D > 1 day D > 3 hours EOBT Output Airport ATS Taxi times, Runway in use Airspace Activation D > 1 week Access interface (B2B –B2C) Traffic restrictions e-ASM AIXM 5.1extensions e-RAD AIXM AUP UUP e-AMI ANSP AMC e-RAD Upd. EAUP e-AMI Interface (B2B –B2C) RAD AIP e-RAD Static AIRAC data NOTAM NOTAM/ RAD AIP + e-RAD AIXM SDO AIXM / INO Static Data AISP ANSP

6 ADR Developments on Data Management Activities
Data Catalogue listing the required data elements released This catalogue and its annexes will be used as a basis to develop B2B ADR data download services (FB 441) AIXM modeling issues are being addressed (i.e. TV, sector configuration etc) ADR extension of AIXM 5.1 is released to cover CFMU 16 ADR developments

7 ADR Data Catalogue

8 Improvement of Data Provision means
Status on Data Management Data Repository Data provision Interface Format Formal Arrangements Consolidation process IAIP data SDO AIXM data set B2B B2C EAD ... SDO Data Completeness Is the main focus CFMU CIAM AUP/UUP CACD AIXM 5.1 (e-AMI) B2B B2C ATFCM Data Consistency with SDO is the main focus Improvement of Data Provision means is the main focus No formal arrangements Restrictions Ops. Airspace CACD Manual ATM static AIXM CFMU

9 Status on Data Management
EAD/SDO Data Alignment Exercise Major progress has been made on the data alignment and harmonization activity between EAD/SDO & CACD Data alignment exercise started in March 2010 Data concerned are: AD, PT, AS and RT (only enroute. TP’s are not part of the minimum SDO data set ) Amount of data in CACD: AD :7852 PT: 19333 AS: 7921 RT: 4603 Area coverage : limited to ECAC+

10 Status on Data Alignment
Inconsistencies Aerodrome Natural key ID (missing in one of the databases) coordinates problems At start 822 AD’s, today 67 AD’s Pending issues Software improvement ( AD collocated with AD or PT) Military AD, private AD (not published in EAD) Still few coordinates problems

11 Status on Data Alignment
Points Natural key ID (missing in one of the databases) type for NAVAIDS (VOR, NDB, ILS,..) coordinates problems At start 2252 PT, today 758 PT (715 require extension of min SDO dataset) Pending issues Software improvement ( PT collocated with AD or with other PT) Military PT, VFR PT , AD points (not published in EAD) !! TP’s not being part of the minimum SDO dataset, AD navaids (Llz, Ils,Loc,..) are missing in SDO

12 Status on Data Alignment
Milestones AD: Data issues under control. Software CR to finish the work (CFMU 17 release) PT: Data issues finished by AIRAC 12 Jan 2012. AS: Analyze and data correction by End 2012. RT: Analyze and data correction by End 2012

13 ADR Related Release Developments 2012
2009 2010 2011 2012 EAD R6E1 CFMU CFMU CFMU 16.5 e-RAD Operational e-AMI pilot phase EAUP on NOP Enabling interoperability with ASM tools (FB 432) Access to AIXM aligned operational data (FB 441) Publication of FRA/DCT restrictions with e-RAD e-Restrictions via ftp e-AMI operational Corrections for FB 441/432 ( FB 566)

14 ADR Developments enabling ASM Process
ETFMS AMC IFPS ASM Tool 3 Airspace Request AUP/UUP (FB 432/FB 566) (FB 572) ADR Airspace Requests Requested Confirmed Accepted Earmarked In Queue Allocated Reference 4 5 Airspace Allocation / Route Opening & Closure 2 CDR 1 & Airspace Availability Live Updates (FB 510) 1 AIRAC: Base definitions + Airspace Available (FB 441) eAMI EAUP 6 ( OPS deployed)

15 ADR Road Map 2013-2014 NOP Access Layer NM operations
Publication of ATM Data through ADR: Live Updates (FB510 – NM17.5) and New Data (FB567 – NM18) CACD NOP Access Layer Interoperability between EAD and CACD (FB569 – NM17, FB511 – NM18) Remote provision of ATM / non-AIP data (FB532 – NM18) Prepare Ops Deployment with ASM tools (FB572 – NM17) EAD

16 Status on ADR Developments
ADR Safety Case development started in Feb 2012 in order to demonstrate the level of data quality going out from CACD downstream FHA Workshop took place on 25 April 2012 FHA/PSSA report delivered