Presentation is loading. Please wait.

Presentation is loading. Please wait.

New Data Center Update Brian Shannon & Anne Silvester.

Similar presentations


Presentation on theme: "New Data Center Update Brian Shannon & Anne Silvester."— Presentation transcript:

1 New Data Center Update Brian Shannon & Anne Silvester

2 Our New Data Center Located At One Summer St. Boston

3 Our New Data Center Building Characteristics 3,300 sq ft 5 20 Ton A/C Units 250KW UPS Generator N + 1 Infrastructure Redundancy Throughout Facility. Multiple Entry Fiber Paths. Multiple Power Grids for Redundant Power. 24 Hour Manned Security, Cameras & Digital Monitoring. Up to Twenty-Four (24) Day Fuel Supply On Site.

4 “If You Build It They Will Come” Our new Data Center at One Summer St. will be used for Enterprise Servers The space and power regained in W91 will allow for the expansion of co-location services

5 Our Lovely New Room

6 Timeline Working with the design & engineering firm Vanderweil on the room Fit Out Target completion date for Fit Out construction & cabinets deployed – April 15 2008 Target completion for network Build Out – June 15 2008 Q1 FY09 Server Ops move 25% of servers Q2-Q3 FY09 Server Ops move an additional 50% Q4 FY09 Server Ops move last 25% of servers

7 Relocation Strategies Relocate “simpler” environments first Take advantage of virtualization in advance, if eligible Locate applications/services on hardware renewal schedules Establish advance network requirements (F5s, network fabrics, SAN)


Download ppt "New Data Center Update Brian Shannon & Anne Silvester."

Similar presentations


Ads by Google