Download presentation
Presentation is loading. Please wait.
Published byRandolph Chase Modified over 9 years ago
1
WP3: ‘Rapid data delivery at 4 NDACC stations’ Partners: BIRA-IASB INTA Universitaet Bern Karlsruher Institut fuer Technologie CNRS Universitaet Bremen Université de Liège Science and Technology B.V. NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 1
2
WP3 objectives To implement procedures for operational delivery of NDACC data to the NORS data server with a delay of maximum 1 month after data acquisition Use of a common HDF format compliant with GEOMS (Generic Earth Observation Metadata Standard) guidelines Data and stations: NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 2
3
WP3 tasks NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 3 For all WP3 participants: Task 3.1: Development of software routines to save data in the defined HDF format compliant with GEOMS Task 3.2: Implementation of automatic data processing systems generating the data products, including a QA/QC validation step Task 3.3: Set up of data delivery systems providing the data products within 1 month to the NORS data center (MS3, Month 6: April 2012) Task 3.4: Test runs and demonstration of operational data delivery system Task 3.5: Optimisation of data delivery system Task 3.6: Routine data delivery to the NORS data center (D3.1, Month 21: July 2013)
4
Rapid data delivery system NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 4 IASB-BIRA rapid data delivery system (UV-VIS data): Absorption spectra at station ftp Absorption spectra on BIRA-IASB server QDOAS analysis DSCDs OEM profiling Vertical profile +information content +error budget Vertical columns +information content +error budget column retrieval AMF LUTs AVK LUTs HDF files ftp HDF files on NORS data server QA/QC
5
HDF/GEOMS data format NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 5 Format description and tools for HDF files creation are available on AVDC at: http://avdc.gsfc.nasa.gov/index.php?site=1876901039 Important for the NDACC UV-vis WG to move to this data format
6
Quality Assurance/Quality Control Regarding the HDF files content and format, verifications are performed by the idlcr8hdf.sav IDL program, e.g.: −Variable values outside the specified range −Uncorrect fill-in values −Inconsistencies in the time variable (DATETIME) …. Additional quality checks to implement (to be discussed): −Profile retrievals based on OEM: remove retrievals with low DOFS and/or large residuals −For stratospheric NO 2 columns, remove data contaminated by tropospheric pollution (Langley- plot technique) …. NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 6
7
Planning of rapid data delivery Month 6 (April 2012): for each partner, set up and demonstration of their rapid data delivery system Months 7-20 (May 2012-June 2013): Optimisation of data delivery systems Month 21 (July 2013): Operational data delivery Month 22 (August 2013): Preliminary documentation of data delivery systems Month 33 (July 2014): Final documentation of data delivery systems NORS/NDACC UV-VIS meeting, Brussels, 3-4 July 2012 7 After NORS, implementation of a similar data delivery system for all the NDACC UV-vis stations ?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.