1 Objective FCM04 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013

2 ESSIP Plan 2013 / Objective FCM042 Objective FCM04 Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2012 Objective Coordinators Analysis, recommendations, tips & tricks Links and contacts

3 Comprehensive Explanation ESSIP Plan 2013 / Overview LSSIP 20123 Area of applicability: France, Germany, Italy, Poland, Spain, Switzerland Applicable to: Paris, Bordeaux, Marseille, Brest, Karlsruhe, Roma, Warsaw, Madrid, Barcelona, Geneva and Zurich FMP Initial Operational Capability (IOC): 09/2013 Full Operational Capability (FOC): 12/2015 The objective will ensure the deployment of Short Term ATFCM Measures – Phase 1 (as defined by the Interim Deployment Programme – IDP) As deployed in London, Raims and Maastricht FMP A more automated version of STAM (labeled STAM phase 2) will be released in the next years by SESAR – Not within the scope of FCM04!

4 What is new or has changed since LSSIP 2012 ESSIP Plan 2013 / Overview LSSIP 20124 Not the case. New objective.

5 Link to European ATM Master Plan ESSIP Plan 2013 / Overview LSSIP 20125 Objective FCM04 covers the following SESAR OI steps: OI step - [DCB-0205] – Short Term ATFCM Measures

6 Most important SLoA(s) FCM04-ASP01 – Availability of demand-capacity balancing tools via CHMI (finalisation date 12/2015) FCM04-ASP02 – Provision of ANSPs sector and traffic occupancy parameters data to NM (finalisation date 12/2015) FCM04-ASP03 – Implement FCM procedures to enable application of flow management techniques on traffic streams closer to real-time and including more accurate assessment of forecast sector loads and cooperative management of groups of sectors and ATCO resources (finalisation date 12/2015) ESSIP Plan 2013 / Overview LSSIP 20126

7 Finalisation Criteria and Closed Questions ESSIP Plan 2013 / Overview LSSIP 20127 Finalisation criteria: Contact your subject matter expert to determine the deployment Status for each SloA Closed questions: Closed Questions have been introduced for this Objective Statements on Deployment Status should provide answers to Closed Questions

8 ESSIP Report 2012 ESSIP Plan 2013 / Overview LSSIP 20128 Not the case. New objective.

9 Objective Coordinators Analysis, recommendations, tips & tricks ESSIP Plan 2013 / Overview LSSIP 20129 Ensure that your subject matter expert is involvement once you make your statement. Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. Attention to the applicability to the Military stakeholders as airspace users.

10 Links and contacts ESSIP Plan 2013 / Overview LSSIP 201210 Objective Coordinator: Octavian CIOARA +32 2 729 3282 octavian.cioara@eurocontrol.int NMD Objective Expert: Marcel RICHARD +32 2 729 9857 marcel.richard@eurocontrol.int