A PESENTATION ON WIND ENERGY GENERATION BY S.P.S.NEEMRANA SE(E)

Similar presentations


Presentation on theme: "A PESENTATION ON WIND ENERGY GENERATION BY S.P.S.NEEMRANA SE(E)"— Presentation transcript:

1

2 A PESENTATION ON WIND ENERGY GENERATION BY S.P.S.NEEMRANA SE(E)

3 WIND ENERGY GENERATION The Wind Electrical Generator (WEG) can be installed only in wind potential area. Govt. of India has given incentives -  80% depreciation in the first year (Commissioned before September end)  40% depreciation in the first year (Commissioned before March end)

4 WIND ENERGY GENERATION  10 year tax holiday on income from wind power. Power generated can be 'banked' with the TNEB's grid and the same can be used for consumption at a later date, as specified by the SEB (One year Maximum). Power generated can be 'wheeled' through TNEB's grid and the same can be consumed captive any where in the state (Wheeling charges 5%). Power generated can be sold to TNEB @ Rs 2.90 per unit. Finance from the banks is available upto 80% of the project cost.

5 LAND VESTA RRB : VESTA RRB : Cost of land included limited to Rs. 6 Lakhs. Registration charges extra. SUZLON: Cost of land included limited to Rs.15 Lakhs.

6 CAPACITY VESTA RRB – 600 KW SUZLON- 600 KW INITIALCOS T VESTA RRB – 350Lakhs SUZLON- 395 Lakhs

7 PAYBACK PERIOD (APPROX) VESTA RRB - 7 Years SUZLON- 7 Years LIFE EXPECTANCY VESTA RRB – 20 Years SUZLON-

8 GENERATION (Units per Annum) VESTA RRB 14,00,000 units per Annum SUZLON – 17,00,000 units per Annum

9 AMC VESTA RRB : Annual Operation & maintenance contract available. SUZLON : From 2nd year from date of commissioning to 10th year Rs.10 Lacs per WTG with 5% annual escalation after second year, for each year cumulatively.

10 INTERFACING WITH GRID VESTA RRB: If the OHT line exceeds 250 m then extra @ Rs.8/- Lakhs per KM.

11 SALIENT FEATURES-VESTA VESTA RRB Indo-Danish joint venture for manufacture of wind electric generators. Microprocessor based fully automatic control system. Integrated power transmission mechanism. ISO 9001:2000 Certification for manufacture, installation and servicing of WEGs from DNV.

12 First WEG in India to receive the type approval certificate from C-WET (Centre for wind energy technology), an autonomous body offers the pitch regulated WEGs. This feature allows the blades to pivot along their longitudinal axis. As the wind velocity increases, the surface against the wind decreases

13 SALIENT FEATURES- SUZLON SUZLON R & D at Suzlon Energy GmBh Germany for Wind energy converters & AE - Rotor Technical BV Netherlands for rotor blades. Minimum stress and load through well balanced weight distribution. Advanced hydrodynamic fluid coupling absorbs load peaks

14 Hi-speed asynchronous generator with multi stage intelligent switching compensation system delivers power factor up to 0.99 Grid friendly design generates harmonics free pure sinusoidal power Unmatched fine pitching with 0.1 degree resolution to extract every possible unit of power

15 CO-ORDINATION AND FOLLOW-UP WITH GOVT. AND RELATED AGENCIES. VESTA RRB YES SUZLONYES