Download presentation
Presentation is loading. Please wait.
Published byBeryl Bruce Modified over 9 years ago
1
21/07/20061 Preparation of Station Acceptance Rig
2
21/07/20062 Room Layout Half of Room537
3
21/07/20063 X-Y stage: delivery mid-August –35cm x 45cm travel (allow for a garage) –4μm precision (set by the rotary encoder) –multi-axis controller Co57 Source: ready to order? –1mm active diameter rod-type capsule –111MBq activity 7.5x10 6 photons/sec/ster within 1mm diameter at 10mm distance, ~ 10 3 photons absorbed while going through 3 doublet layers Readout issue needs to be resolved… –Input from Alan Bross, Paul Rubinov: AFE can self-trigger, but significant changes in firmware required –What threshold p.e. would be reasonable? Purchases
4
21/07/20064 Mechanical: –patch panel, source mounting on the stage Resources: –3-phase main, He gas Readout/DAQ: –components availability check + arrangements for reception –AFE self-trigger: further consultation with Paul Rubinov –data management To Do
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.