Presentation is loading. Please wait.

Presentation is loading. Please wait.

21/07/20061 Preparation of Station Acceptance Rig.

Similar presentations


Presentation on theme: "21/07/20061 Preparation of Station Acceptance Rig."— Presentation transcript:

1 21/07/20061 Preparation of Station Acceptance Rig

2 21/07/20062 Room Layout Half of Room537

3 21/07/20063 X-Y stage: delivery mid-August –35cm x 45cm travel (allow for a garage) –4μm precision (set by the rotary encoder) –multi-axis controller Co57 Source: ready to order? –1mm active diameter rod-type capsule –111MBq activity  7.5x10 6 photons/sec/ster  within 1mm diameter at 10mm distance, ~ 10 3 photons absorbed while going through 3 doublet layers Readout issue needs to be resolved… –Input from Alan Bross, Paul Rubinov: AFE can self-trigger, but significant changes in firmware required –What threshold p.e. would be reasonable? Purchases

4 21/07/20064 Mechanical: –patch panel, source mounting on the stage Resources: –3-phase main, He gas Readout/DAQ: –components availability check + arrangements for reception –AFE self-trigger: further consultation with Paul Rubinov –data management To Do


Download ppt "21/07/20061 Preparation of Station Acceptance Rig."

Similar presentations


Ads by Google