Download presentation
Presentation is loading. Please wait.
Published byStephany Rose Modified over 9 years ago
1
Topographic Maps vs DEM
2
Topographic Map 1:24,000 Scale http://www.tnrcc.state.tx.us/gis/raster.html 20 ft contour 100 ft contour Stream Center Line
3
Flow in Direction of Steepest Descent
4
Watershed Delineation by Hand Digitizing Watershed divide Drainage direction Outlet
5
30 Meter Mesh Standard for 1:24,000 Scale Maps
6
30 Meter DEM Cell Boundaries
7
USGS 30 Meter DEM for This Area
8
DEM Lattice Points
9
DEM Cell Stores Elevation at Lattice Point
10
DEM Elevations Contours 720 700 680 740 680700720740 720
11
DEM Elevations Contours 700 680
12
6756494650 121112 5344373848 5855223124 6147211619 3453 Digital Elevation Model
13
6756494650 121112 5344373848 5855223124 6147211619 3453 50 30 m cell cell (cell value) Cell Definition
14
Dealing with the Pits
15
Filling in the Pits DEM creation results in artificial pits in the landscape A pit is a set of one or more cells which has no downstream cells around it Unless these pits are filled they become sinks and isolate portions of the watershed Pit filling is first thing done with a DEM
17
+ = Take a mapped stream network and a DEM Make a grid of the streams Raise the off-stream DEM cells by an arbitrary elevation increment Produces "burned in" DEM streams = mapped streams “Burning In” the Streams - Improve accuracy based on photograph
18
The Flow Direction Grid
19
32 16 8 64 4 128 1 2 Eight Direction Pour Point Model
20
675649 534437 585522 1 675649 534437 585522 1 Slope: Direction of Steepest Descent
21
22448 1216 12484 1281248 21444 11 Flow Direction Grid
22
Flow Direction Grid- Red is NE 32 16 8 64 4 128 1 2
23
Grid Network
24
The Flow Accumulation Grid
25
00000 0 0 0 0 0 0 0 0 032 2 11 1 1 15 25 24 1 Flow Accumulation Grid Grid Network Count the # of contributing cells
26
00 0 00 0 0 0 0 0 0 0 0 0 322 11 1 1 1 2 15 245 Flow Accumulation Grid
27
Defining the Stream Grid
28
00 0 00 0 0 0 0 0 0 0 0 0 322 11 1 1 1 2 15 245 Flow Accumulation > 5 Cell Threshold
29
Stream Network for 5 cell Threshold Drainage Area 00000 0 0 0 0 0 0 0 0 032 2 11 1 1 15 25 24 1
30
Streams with 200 cell Threshold (>18 hectares or 13.5 acres drainage area)
31
989510 1504 (>1000) 1000 Cell Threshold Exceeded at Stream Junction
32
Defining Stream Segments
33
00000 0 0 0 0 0 0 0 0 032 2 11 1 1 15 25 24 1 Stream Segments
34
5 5 1 1 1 3 2 2 3 3 4 4 4 4 4 5 5 6 6 6 Stream Segments in a Cell Network
35
Creating Subwatersheds
36
Watershed Outlet
37
Watershed Draining to This Outlet
38
Watershed and Drainage Paths Delineated from 30m DEM Automated method is more consistent than hand delineation
39
Same Cell Value Subwatersheds for Stream Segments
40
Vectorized Streams Linked Using Grid Code to Cell Equivalents Vector Streams Grid Streams
41
Delineated Subwatersheds and Stream Networks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.