Presentation is loading. Please wait.

Presentation is loading. Please wait.

ITS/CVO Program - CVISN Deployment Roadmap Interoperability Test JHU/APL 18 Apr 2000 CVISN Level 1 Model Deployment Management & System Integration Architecture.

Similar presentations


Presentation on theme: "ITS/CVO Program - CVISN Deployment Roadmap Interoperability Test JHU/APL 18 Apr 2000 CVISN Level 1 Model Deployment Management & System Integration Architecture."— Presentation transcript:

1 ITS/CVO Program - CVISN Deployment Roadmap Interoperability Test JHU/APL 18 Apr 2000 CVISN Level 1 Model Deployment Management & System Integration Architecture & Standards CVISN Architecture Baselined Policy & Management Qtr 1 Qtr 2 Qtr 3 Qtr 4 Outyears CY 2001 CY 2000 Technical Support Nationwide Deployment 2003 2004 2005 MD VA KY First States to Achieve CVISN Operational Level 1 In 1997, each Model Deployment Initiative State completed a CVISN Program Plan and a State CVISN Top- Level Design for each Program Area. Initial Test Preparation MDI States Interface Pairs Testing MDI States End-to-End Testing Most Pilot States will achieve CVISN Level 1 in Year 2001 Shift to O & M Mode ITS/CVO O&M Policy & Planning Intelligent Vehicle Initiative (IVI) TEA-21 Highway Reauthorization Bill Architecture Utilization & Conformance Policy CVISN Program Review ITS/CVO Regional Coordination Plans EDI TS 285 Draft Standard for Trial Use (DSTU) Jun 97 EDI TS 286 DSTU DSRC-Approved Std (IEEE & ASTM) DSRC V7 Products Widely Available O & M CVISN Level 2 & 3 Development Continuing CVISN Development & Deployment Policy State ITS/CVO Business Plans Fund Model Deployment Completion FY01 Funding of Selected States CA CO CT WA MN MI Interoperability Testing to Support Deployment CVISN Web Site & CVISN Tool Kit DOT/FMCSA Web Site: JHU/APL CVISN Web Site: http://www.fhwa.dot.gov/ http://www.jhuapl.edu/cvisn/ Guides Training Courses Outreach Technology Truck Advisory Support After completing the ITS/CVO Training Classes, State Teams prepare their CVISN Top-Level Design and Program Plan during a series of workshops Deployment Workshops State CVISN Program Plans FY02 Funding of Selected States FY03 Funding of Selected States FY04 Funding of Selected States Prototype States Test Group 1 End-To-End Inspection reporting Credentials update to snapshots Electronic screening Prototype States Test Group 1 Pairwise CAT - CI CVIEW - SAFER DSRC Reader - Tag State Operational Practice Agreements Private / Public Agreements Safety Information Exchange Credentials Administration Electronic Screening V1.5 CVIEW ASPEN/AVALANCHE V1.4 SAFER V3.0 SAFER V4.0 V1.6 VA MD ASPEN/AVALANCHE V1.3/1.4 CVIEW V3.0 V4.0 MDVA NY RPC MD VA Technical Level 1 Capability Stephens City, ROC VA SAFER IDT InterCAT/CI IRP T & T I-95 Perryville MD IFTA CH Key = Project under initial development = Incremental updates to project = CVISN Level 1 Capability VISTA/RS VISTA/TS IDT InterCAT/CI IRP T & T Dec 96 Oct 96 Jul 97 EDI TS 285 Production EDI TS 286 Production ITS Deployment Tracking Status of States’ CVISN Deployment Advisory Support Training Guides Tool Kit Deployment Workshops Lessons Learned Used to Continually Improve and Extend Technical Support MD VA ASPEN/AVALANCHE V1.5 Calendar Years / Quarters Mainstreaming Forums OR Oregon dropped out CVIEW Incremental Deliveries of CA Systems VISTA/TS IRP CH XML White Paper and Survey I-95 Perryville Technical Level 1 Capability Operational Level 1 Capability Stephens City, ROC VA Set 1 Interoperability Tests Defined Set 2 Interoperability Tests Defined Set 3 Interoperability Tests Defined Oct 98 CY 2002 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Architecture & Standards Maintenance New Deployment States expected to achieve CVISN Level 1 beginning in Year 2002 The CVISN Guides are a series of documents that provide a means for advising future CVISN deployment state personnel on ;how to make use of what has been already developed and learned by the Prototype and Pilot States. Motor Carrier Industry Awareness Seminars ITS/CVO Brochures Technology Truck ROVER Van Introduction to ITS/CVO ITS/CVO Project Management for Non-Technical Managers Understanding ITS/CVO Technologies Federal Aid Planning Architecture Conformance/ Interoperability Testing Other Hands-On Courses and focused seminars Deployment Workshop Series Scope Workshop - Preliminary Top - Level Design Planning Workshop - State CVISN Program Plan Design Workshop - Review/Update Top - Level Design Introduction to CVISN CVISN Statement of Direction CVISN Operational Concept Document CVISN Guides (8) CVISN Operational and Architectural Compatibility Handbook (COACH) (5) CVISN System Design Description Lessons Learned Summaries Examples of Prototype and Pilot State Program Plans White Papers and Fact Sheets on ITS/CVO Projects SAFER System Overview SAFER Project Plan SAFER/CVIEW User and System Requirements Documents SAFER/CVIEW Logical and Physical Requirements Documents Snapshot White Paper SAFER/CVIEW Operations and Maintenance Plans CVIEW Information Package CVIEW Requirements Document CVIEW Design Document The CVISN Site on the World Wide Web provides planning and technical information for the CVISN Program and is used to distribute program documentation for review and use. Most of the documents produced by JHU/APL are available on this web site. http://www.jhuapl.edu/cvisn/ The CVISN Tool Kit is a comprehensive set of technical documentation and planning tools assembled on a CD-ROM to assist states in the deployment of CVISN. The documentation on the Tool Kit will be linked to the CVISN Web Site to allow the user to browse and download the latest versions of CVISN material. Workshop Session Material and Guidance Credentialing Interface (CI) Design Document Credentials Administration Requirements Specification (CARS) EDI Standards and Implementation Guides DSRC Standards Interoperability Test Strategy Interoperability Test Suite Package Sample Test Plans CVISN Glossary General CVISN Documents and Standards SAFER and CVIEW Documentation Spreadsheets and Other Tools Technical and Administrative Point of Contact Information Planning and Design Worksheets Representative System Flow (“Thread”) Diagrams WWW Access Links A variety of technical and administrative experts are available to assist the states in achieving their CVISN goals: JHU/APL CVISN project managers and architecture and standards experts Experienced personnel from the Prototype and Pilot States, including state project managers, system architects, and functional managers. ITS/CVO specialists from the FMCSA Division Offices and Service Centers Personnel from FHWA Headquarters ITS/CVO Trainers and CVISN State Advisors (CSAs) ITS America Staff Motor carrier associations staff [American Trucking Associations (ATA), National Private Truck Council (NPTC), Owner-Operator Independent Driver Association (OOIDA) and others] State associations staff (AAMVA, CVSA, IRP Inc., IFTA Inc., and others) CY 1999


Download ppt "ITS/CVO Program - CVISN Deployment Roadmap Interoperability Test JHU/APL 18 Apr 2000 CVISN Level 1 Model Deployment Management & System Integration Architecture."

Similar presentations


Ads by Google