Download presentation
Presentation is loading. Please wait.
Published byPatrick Osborne Modified over 9 years ago
1
#ConnWeek Demand Response C&I Case Studies
2
#ConnWeekSanta Clara, CA May 22-24, 20122 C&I Case Studies The following case studies were performed at small facilities that typically would not be a good fit for Demand Response. Two Fitness Centers Small Retailer Automobile Dealership Small Office Building
3
#ConnWeekSanta Clara, CA May 22-24, 20123 The Sites
4
#ConnWeekSanta Clara, CA May 22-24, 20124 The Sites
5
#ConnWeekSanta Clara, CA May 22-24, 20125 The Sites
6
#ConnWeekSanta Clara, CA May 22-24, 20126 The Sites
7
#ConnWeekSanta Clara, CA May 22-24, 20127 The Sites
8
#ConnWeekSanta Clara, CA May 22-24, 20128 REGEN Equipment Site Name# of AC Units with controllers ACE Hardware4 Fitness Center14 Fitness Center #214 Chevrolet Dealership11 Office Building9
9
#ConnWeekSanta Clara, CA May 22-24, 20129 Site Monitoring
10
#ConnWeekSanta Clara, CA May 22-24, 201210 Customer Comfort Responses to Baseline Day: How comfortable are you with the temperature today at work?
11
#ConnWeekSanta Clara, CA May 22-24, 201211 Customer Comfort Responses to DM event: How comfortable were you with the temperature between 4-7 PM?
12
#ConnWeekSanta Clara, CA May 22-24, 201212 Customer Comfort Responses to DR1 event: How comfortable were you with the temperature between 4-7 PM?
13
#ConnWeekSanta Clara, CA May 22-24, 201213 Customer Comfort Responses to DR2 event: How comfortable were you with the temperature between 4-7 PM?
14
#ConnWeekSanta Clara, CA May 22-24, 201214 Average Peak Demand and Savings by Site
15
#ConnWeekSanta Clara, CA May 22-24, 201215 Additional Savings kWh savings realized by utilizing REGEN’s scheduling functionality
16
#ConnWeekSanta Clara, CA May 22-24, 201216 REGEN’s OpenADR implementation provides full functionality to ensure reliable load curtailment Flexible DRAS Configuration Can support separate DRAS servers per DR program Flexible DR Program Subscription Specify desired load shed, baseline methodology per time period Can even subscribe to multiple programs during the same time period Robust Scheduling Features Ability to precede event to ensure ready at start Fully integrated with existing EnviroGrid Portal scheduler Auditability Records DR event participation Tracks baseline vs. DR event performance Alerts Ensures desired Demand Response curtailment achieved 16
17
#ConnWeekSanta Clara, CA May 22-24, 201217 REGEN Energy Swarm Energy Management Contact: James McPhail james@REGENenergy.com 909.809.7635 www.REGENenergy.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.