Download presentation
Presentation is loading. Please wait.
Published byStanley Bates Modified over 9 years ago
1
SRG 1 X-RAY Astronomy 2009, Bologna, 11 September, 2009 Spectrum-Roentgen-Gamma astrophysical project, current status Mikhail Pavlinsky (IKI, Moscow) on behalf of SRG team
2
SRG 2 News – August 18, 2009, Roscosmos (Russia) and DLR (Germany) signed an Agreement «On cooperation in the framework of Spectrum-Roentgen-Gamma orbital astrophysical project»
3
SRG 3 Roscosmos, Russia Space Research Institute, IKI, Moscow, Russia Lavochkin Association, Khimki, Russia VNIIEF, Sarov, Russia Max-Planck-Institute for Astrophysics, MPA, Garching, Germany Istitut fur Astronomie und Astrophysik, Univ. Tubingen, Germany Astrophysikalishes Institut Potsdam, Germany University Erlangen-Nuernberg, Germany Hamburg University, Germany Max-Planck-Institute for Extraterrestrial Physics, MPE, Garching, Germany DLR, Germany
4
SRG 4 –S/C to be launched in 2012 from Baikonur –Rocket Soyuz-2/1b + buster Fregat, with gravity manoeuvre around the Moon –Halo-orbit around L2 –Platform Navigator (Lavochkin Association) –S/C total mass 2200 kg –Payload − 1110 kg, 800 W: eROSITA (MPE, DLR, Germany), X-ray mirror telescopes, 0.5−10 keV ART-XC (IKI + VNIIEF, Roscosmos, Russia), X-ray mirror telescopes, 6−30 keV –Life time − 7 years
5
SRG 5 2009 June, 2008
6
SRG 6 Navigator Solar panels drive mechanism On-board control system, radio system and TMS equipment Flywheel engines Radiator Solar panels Propulsion system Body Tank S/C dry mass900 kg S/C propellantup to 300 kg PL mass2000 kg PL power1500 W (HEO) PL power600 W (LEO) Pointing2 Stabilization 5 Stabilization rate0.36 /s Reappointing rate0.25 /s Life time7 years
7
SRG 7
8
8 The three months – flight to L2, verification and calibration of payload 4 years – an all sky survey 3 years – on follow-up pointed observations of a selection of the most interesting galaxy clusters and AGNs. Observing strategy:
9
SRG 9 eROSITA @ ART-XC on-axis effective area and grasp 2500 cm 2 @ 1.4 keV 510 cm 2 @ 7 keV 1100 cm 2 deg 2 @ 1.4 keV 45 cm 2 deg 2 @ 7 keV
10
SRG 10 The study of the large-scale structure of the Universe with 100 000 galaxy clusters The exploration of the growth and cosmological evolution of supermassive Black holes in the Universe with sample 3 million AGNs The scientific goals of the SRG/eROSITA all-sky survey: 3.5 10 14 M (T 4.5 keV) up to z=2 2.3 10 14 M (T 3.5 keV) up to z=1 10 14 M (T 2 keV) up to z=0.4
11
SRG 11 and with ART-XC – complementary instrument All-sky survey at 6 11 keV energy band with sensitivity 3 10 -13 erg s -1 cm -2 keV -1 discovery at local Universe several thousands new AGNs Study of massive nearby galaxies clusters with T 5 keV in the pointing observation mode Study of intrinsically heavily absorbed/Compton thick AGNs ( N H 3 10 23 см -2 ) Survey of galactic black holes and neutron stars with low luminosity Study heavily obscured galactic X-ray binary systems Study broad band spectra of Galactic objects (including binary systems, anomalous pulsars, SNRs) up to 30 keV, spectroscopy and timing of point sources Study of cyclotron lines features of X-ray pulsars with energy resolution 1.5 keV up to 30 keV
12
SRG 12 Survey Параметры обзора всего неба eROSITA: SRG ~100 000 Clusters 3 Million AGN ~20 QSO at z>7
13
SRG 13 eROSITA (MPE, DLR) Number of mirror systems7 Number of nested mirror shells54 FOV1 On-axis angular resolution15 (1 keV) Energy range0.2 – 12 keV Diameter of 1 mirror system358 mm Form of shellWolter-1 Focal length1600 mm Material of mirror shellsNickel Mirror coatingGold Total weight760 kg Power consumption405 W
14
SRG 14 eROSITA (MPE, DLR) Detector principlepn-CCD, Si Size28.8 28.8 mm 2 Energy resolution130 eV @ 6 keV Pixels384 384 Pixel size75 75 µm 2 Circle time50 msec Working temperature 80 C
15
SRG 15 Number of mirror systems7 Number of nested mirror shells28 FOV 32 On-axis angular resolution 1 Energy range6 – 30 keV Diameter of mirror system148 mm Form of shellcone-cone Length of shell580 mm Focal length2700 mm Material of mirror shellsNickel Mirror coatingIridium Total weight350 kg Power consumption300 W ART-XC (IKI, VNIIEF, Roscosmos)
16
SRG 16 Number of detectors7 Detector principleDSSD CdTe CdTe manufacturerACRORAD Size25.6 25.6 mm 2 Thickness1 mm Number of strips64 64 Strip pitch0.4 mm Energy resolution 10% @ 14 keV Time resolution1 ms Working temperature 40 35 C Entrance window100 m, Be ASICVA64TA Background≤10 -2 cnt s -1 cm -2 keV -1 Prototype with 32 pixels Am 241 ART-XC, detector
17
SRG 17 ART-XC
18
SRG 18 Exposition time map for ½ year all-sky survey. The rotational axis is directed on Sun constantly. The minimal 4-year exposition is 1900 sec deg -2. The survey poles position are coincide with ecliptic poles. The total size of 2 zones with exposition larger than 8000 sec deg -2 (near the survey poles) is 1260 deg 2. ART-XC
19
SRG 19 ART-XC
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.